BMP C233: Silt Fence <br /> BMP: C241 Temporary Sediment Pond <br /> Silt fence is proposed at the downhill side of all earthwork and clearing within the project area. The silt <br /> fence should be installed at the earliest possible opportunity and must be in place prior to beginning any <br /> major earthwork activities. Silt fence will be installed parallel to the contour lines and where they <br /> intercept runoff approaching at right angles. The locations of the silt fences as well as proposed BMPS <br /> are shown on the Site Preparation and Erosion Control plan sheets in Appendix A of this C-SWPPP. <br /> Alternate sediment control BMPS are included in Appendix C as a quick reference tool for the on-site <br /> inspector in the event the BMP listed above is deemed ineffective or inappropriate during construction <br /> to satisfy the requirements set forth in General NPDES permit (Appendix D).To avoid potential erosion <br /> and sediment control issues that may cause a violation of the NPDES Construction Stormwater permit, <br /> the Certified Erosion and Sediment Lead will promptly initiate the implementation of one or more of the <br /> alternate BMPs listed in Appendix C after the first sign that existing BMP are ineffective or failing. <br /> In addition, sediment will be removed from paved areas in and adjacent to construction work areas <br /> manually or using mechanical sweepers, as needed,to minimize tracking of sediments on vehicle tires <br /> away from the site and to minimize wash off sediments from adjacent streets in runoff. Whenever <br /> possible, sediment laden water shall be discharged into on-site, relatively level,vegetated areas. <br /> 3.1.5 Element#5—Stabilize Soils <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent erosion <br /> throughout the life of the project. The specific BMPs for soil stabilization that shall be used on this <br /> project include: <br /> BMP C120:Temporary and Permanent Seeding <br /> BMP C121: Mulching <br /> BMP C123: Plastic Covering <br /> BMP C125: Surface Roughening <br /> BMP C140: Dust Control <br /> Plastic covering anticipated to be used as a cover only for temporary stockpile for overburden on south <br /> excavation and as short-term protection for exposed slopes.Care must be taken at the bottom of the <br /> plastic covered slopes so the runoff from the plastic does not cause erosion at the toe of the slope. <br /> 8 <br />