• Design the project to fit the existing topography,soils and drainage patterns. <br /> • Emphasize erosion control rather than sediment control. <br /> • Minimize the extent and duration of area exposed. <br /> • Keep runoff velocities low. <br /> • Retain sediment on site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule earthwork during the dry season. <br /> As this project is located west of the Cascade Mountain Crest,the project will be managed according to <br /> the following key project components: <br /> Phasing of Construction <br /> • The construction project is being phased to extent practicable in order to prevent soil erosion, <br /> and to maximum extent possible,the transport of sediment from the site during construction. <br /> Clearing and earthwork operations should be limited to portions of the project in order to limit <br /> the amount of soil exposed to erosion at any given time. <br /> Seasonal Work Limitations <br /> • Based on the information provided and/or local weather conditions,the local permitting <br /> authority may expand or restrict the seasonal limitation on site disturbance. <br /> • The following activities are exempt from the seasonal clearing and grading limitations: <br /> o Routine maintenance and necessary repair of erosion and sediment control BMPS; <br /> o Routine maintenance of public facilities or existing utility structures that do not expose <br /> the soil or result in the removal of vegetation cover to soil; and <br /> o Activities where there is a 100 percent infiltration of surface water runoff within the site <br /> in approved and installed erosion and sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction projects, and the local <br /> jurisdiction in preparing this C-SWPPP and scheduling the construction work. <br /> 14 <br />