My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2023-12-27
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2023-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 8:29:22 AM
Creation date
12/4/2023 1:08:09 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOENGINEERS� <br /> 17425 NE Union Hill Road,Suite 250 <br /> Redmond,Washington <br /> 425.861.6000 <br /> January 24, 2022 <br /> Washington State Department of Ecology <br /> Toxics Cleanup Program <br /> 300 Desmond Drive SE <br /> Lacey, Washington 98503 <br /> Attention: Christopher Maurer,VCP Project Manager <br /> Subject: Post-Cleanup Groundwater Compliance Monitoring Report and <br /> Request for No Further Action Determination <br /> Former Smith Street Sawmill Site <br /> 3600 Smith Avenue <br /> Everett, Washington <br /> VCP Number NW3188 <br /> GEI File No. 0661-108-03 <br /> On behalf of the City, we are requesting Ecology's review of the enclosed groundwater compliance <br /> monitoring report and opinion on a request for a No Further Action (NFA) determination for the Site. The <br /> groundwater sampling described in the accompanying report was performed to demonstrate compliance <br /> with the Model Toxics Control Act(MTCA)following the soil cleanup of the Site under the Voluntary Cleanup <br /> Program (VCP). <br /> Soil contamination at the Site identified in the Remedial Investigation (RI) and the subsequent data gaps <br /> assessment resulted from fill soil that was historically imported to the Site(southern section)and apparent <br /> historic surface releases to soil from sawmill equipment and/or machinery (northern section) during <br /> machinery operation, log storage and lumber processing when the sawmill was operational. <br /> Environmental site characterization and remedial actions at the Site began in 2016 and continued through <br /> 2021, as follows: <br /> 2015 - 2017: Phase I and Phase II Environmental Site Assessments (ESAs). The results of the <br /> Phase I and II ESAs are presented in reports previously submitted to Ecology: "Phase I <br /> Environmental Site Assessment, Former Smith Street Sawmill, 3600 Smith Avenue, Everett, <br /> Washington" prepared for City of Everett, dated October 27, 2016; "Phase II Environmental Site <br /> Assessment, Former Smith Street Sawmill Property, 3600 Smith Avenue, Everett, Washington" <br /> prepared for City of Everett, dated January 3, 2017. <br /> 2017 - 2018: Remedial Investigation (RI)and Cleanup Action Plan (CAP).The results of the RI and <br /> CAP are presented in the reports previously submitted to Ecology: Remedial Investigation Report, <br />
The URL can be used to link to this page
Your browser does not support the video tag.