Laserfiche WebLink
remedial actions taken will be included. If sampling could not be performed during a monitoring period, <br /> a DMR will be submitted with an explanation of why sampling could not be performed. <br /> 2. Notification of Noncompliance <br /> If any of the terms and conditions of the permit are not met, and it causes a threat to human health or <br /> the environment,the following steps will be taken in accordance with Section 5.F: <br /> 1. Ecology will be immediately notified of the failure to comply. <br /> 2. Immediate action will be taken to control the noncompliance issue and correct the problem. <br /> If applicable,sampling and analysis of any noncompliance will be repeated immediately, and <br /> results submitted to Ecology within five (5) days of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted to Ecology within <br /> five (5) days, unless requested earlier by Ecology. <br /> Any time turbidity sampling indicates turbidity is 250 NTU or greater or water transparency is 6 cm or <br /> less,the Ecology regional office will be notified by phone within 24 hours of analysis as required by <br /> permit conditions section 5.A(see Section 5.0 of this C-SWPPP for contact information). <br /> In accordance with permit condition Section 2.A, a complete application form will be submitted to <br /> Ecology and the appropriate local jurisdiction (if applicable)to be covered by the General Permit. <br /> 22 <br />