My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2025-08-19
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 10:27:54 AM
Creation date
12/4/2023 1:08:09 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix E—Site Inspection Forms (and Site Log) <br /> The results of each inspection shall be summarized in an inspection report that is entered into or <br /> attached to the site log book. It is suggested that the inspection report or checklist be included in the <br /> appendix to keep monitoring and inspection information in one document, but this is optional. <br /> However, it is mandatory that this C-SWPPP and the site inspection forms be kept on-site at all times <br /> during construction, and that inspections be performed and documented as outlined below. <br /> At a minimum,each inspection report or checklist shall include: <br /> a) Inspection date/times <br /> b) Weather information: general conditions during the inspection, approximate amount of <br /> precipitation since the last inspection, and approximate amount of precipitation within the last <br /> 24 hours. <br /> c) A summary or list of all BMPS that have been implemented, including observations of all <br /> erosion/sediment control structures and practices. <br /> d) The following shall be noted: <br /> i. Locations of BMPs inspected, <br /> ii. locations of BMPs that need maintenance, <br /> iii. the reason maintenance is needed, <br /> iv. locations of BMPs that failed to operate as designed of intended, and <br /> v. locations where additional or different BMPs are needed, and the reason(s)why <br /> e) A description of stormwater discharge from the site. The presence of suspended sediment, <br /> turbid water, discoloration, and/or oil sheen shall be noted as applicable. <br /> f) A description of any water quality monitoring performed during the inspection, and results of <br /> that monitoring. <br /> g) General comments and notes, including a brief description of any BMP repairs, maintenance or <br /> installations made as a result of the inspection. <br /> h) A statement that, in the judgement of the person conducting the site inspection,the site is <br /> either in compliance or out of compliance with the terms and conditions of the C-SWPPP. If the <br /> site inspection indicates that the site is out of compliance,the inspection report shall include a <br /> 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.