Laserfiche WebLink
summary of the remedial actions required to bring the site back o compliance, as well as a <br /> schedule of implementation. <br /> i) Name,title, and signature of the person conducting the site inspection; and the following <br /> statement: "I certify under penalty of law that this report is true,accurate, and complete,to the <br /> best of my knowledge and belief <br /> When the site inspection indicates that the site is not in compliance with any terms and conditions of <br /> permits,the Owner/Operator shall take immediate action(s)to: stop,contain, and clean up the <br /> unauthorized discharges, or otherwise stop the noncompliance; correct the problem(s); implement <br /> appropriate Best Management Practices (BMPs),and/or conduct maintenance of existing BMPs; and <br /> achieve compliance with all applicable standards and permit conditions. In addition, if the <br /> noncompliance causes a threat to human health or the environment,the Permittee shall comply with <br /> the Noncompliance requirements in Special Conditions Section 5.F of the permit. <br /> 30 <br />