My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3600 SMITH AVE 2025-08-19
>
Address Records
>
SMITH AVE
>
3600
>
3600 SMITH AVE 2025-08-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2025 10:27:54 AM
Creation date
12/4/2023 1:08:09 PM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3600
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 re <br /> c <br /> rE - zW <br /> Tr Lij z �. E <br /> EVERETT TRANSIT 6 <br /> w wa i.0 <br /> O 0 <br /> ce <br /> `1 2 <br /> TO: THAD NEWPORT CITY OF EVERETT/PERMIT SEI ? w z <br /> ,� roo ,t1 <br /> FROM: VINCE BRUSCAS, PROJECT COORDINATOR F o z z o <br /> DATE: 9/16/19 ar1- Z � <br /> ° . 4-, <br /> . <br /> SUBJECT: Drainage report - `� <br /> v v � <br /> CU B Q �V N U <br /> Q , J v <br /> O <br /> a O 1— Q LT <br /> DRAINAGE REPORT EXECUTIVE SUMMARRY <br /> This drainage report summarizes the stormwater management plans for a <br /> cleanup project at the former Smith Street Mill, including descriptions of how it <br /> will fulfill Minimum Requirements (MR) #1-5. The stormwater site plan MR 1 is <br /> described entirely in this document, while the Stormwater Pollution Prevention <br /> Plan (SWPPP) for MR 2 is presented as a separate document. <br /> The site is predominantly flat with high infiltration capacity, and flow from or onto <br /> adjacent properties is negligible. The cleanup will involve excavation <br /> contaminated soils and backfilling to grade, returning the site to its current <br /> drainage characteristics. No drainage system will be added to the site as in <br /> filtration is adequate to prevent stormwater runoff. <br /> MR 1 — STORMWATER SITE PLAN NARRATIVE <br /> PROJECT OVERVIEW <br /> This project is a soil excavation for environmental remediation at the former Smith Mill <br /> site, as described in the Cleanup Action Plan (CAP) (GeoEngineers 2018). The site is <br /> predominately flat with high infiltration capacity, and flow from or onto adjacent <br /> properties is negligible. The excavation will be a depth of 4 feet across most areas, <br /> reaching 10 feet in one section. Excavation is planned for the late dry season when <br /> there will be only a very small chance of any precipitation and thus erosion control or <br /> ponding water. After the cleanup objectives have been achieved, the excavation will be <br /> backfilled to grade with approved clean gravel burrow. As such, this project will have no <br /> long-term impacts on the drainage characteristics of the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.