Laserfiche WebLink
1.0 INTRODUCTION <br /> This Construction Stormwater Pollution Prevention Plan (C-SWPPP) has been prepared for the 3600 <br /> Smith Street Cleanup Project in Everett,Washington. The project site is a 5-acre project located at the <br /> south end of Everett Station Park and Ride lot at 3600 Smith Avenue.The Public Land Survey System <br /> location is Section 29,Township 28N, Range 05E. The project includes excavation, haul, disposal of <br /> contaminated soil,fill and compaction with clean soil. <br /> Construction activities will include installation of erosion control measures, excavation, haul,fill and <br /> compaction.The purpose of this C-SWPPP is to describe the proposed construction activities, and all <br /> temporary erosion and sediment control measures, pollution prevention measures, inspection and <br /> monitoring activities, and recordkeeping that will be implemented during the proposed construction <br /> project. The objectives of the C-SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs)to prevent erosion and sedimentation, and <br /> to identify, reduce, eliminate or prevent stormwater contamination and water pollution <br /> from construction activity. <br /> 2. Prevent violations of surface water quality,ground water quality,or sediment standards. <br /> 3. Prevent,during construction phase, adverse water quality impacts including impacts on <br /> beneficial uses of the receiving water by controlling peak flow rates and volumes of <br /> stormwater runoff at the Permittee's outfalls and downstream of the outfalls <br /> This C-SWPPP was prepared using the Ecology SWPPP template downloaded from the Ecology website. <br /> The report is divided into seven main sections with several appendices that include stormwater related <br /> reference materials. The topics resented in each of the main sections are: <br /> • Section 1—INTRODUCTION. This section provides a summary description of the project, and <br /> organization of the C-SWPPP document. <br /> • Section 2—SITE DESCRIPTION.The section provides a description of the existing site conditions, <br /> proposed construction activities. <br /> • Section 3—CONSTRUCTION BMPs.This section provides a description of the BMPs to be <br /> implemented based on the 13 required elements of the C-SWPPP. <br /> • Section 4—CONSTRUCTION PHASING AND BMP IMPLEMENTATION.This section provides a <br /> description of the timing of the BMP implementation in relation to the project schedule. <br /> • Section 5—POLLUTION PREVENTION TEAM.This section identifies the appropriate contact <br /> names(emergency and non-emergency), monitoring personnel, and the on-site temporary <br /> erosion and sedimentation control inspector. <br /> • Section—6 INSPECTION AND MONITORING.This section provides a description of the <br /> inspection and monitoring requirements such as parameters of concern to monitored, sample <br /> locations, sample frequencies, and sampling methods for all stormwater discharge locations <br /> from the site. <br /> • Section 7—RECORDKEEPING.This section describes the requirements for the documentation of <br /> the BMP implementation, site inspections, monitoring results, and changes to the <br /> implementation of certain BMPS due to site factors experienced during construction. <br /> 4 <br />