Laserfiche WebLink
Construction Stormwater Pollution Prevention Plan <br /> For <br /> 3600 Smith Street Cleanup <br /> Prepared for <br /> Everett Transit <br /> 3201 Smith Avenue <br /> Suite 215 <br /> Everett, WA 98201 <br /> 425-257-6292 <br /> Owner Contractor <br /> Everett Transit TBD <br /> 3201 Smith Avenue TBD <br /> Suite 215 <br /> Everett, WA 98201 TBD <br /> Project Site Location <br /> City of Everett <br /> Certified Erosion and Sediment Control Lead <br /> Contractor to Provide <br /> C-SWPPP Prepared by <br /> Vincent Bruscas, Project Coordinator <br /> Everett Transit <br /> C-SWPPP Preparation Date <br /> August 2019 <br /> Approximate Project Construction Dates <br /> September—October 2019 <br /> 1 <br />