Laserfiche WebLink
Olin Fields Apartments—Damaged Deck Framing Review <br /> DEI November 9, 2022 <br /> DIBBLE ENGINEERS INC <br /> a I ,% C FlEe• 1 <br /> ----4zo...c <br /> r yr° �"�.. .s.': T <br /> � � `max. �h?• <br /> ry, � <br /> Photo 5 Photo 6 <br /> Building C: Damaged Rim, Floor Joists, Building C: Damaged Rim <br /> & Floor Sheathing @ Vents <br /> ',Mk '411111111101 <br /> - <br /> • <br /> (c <br /> _ k`+ <br /> Photo 7 Photo 8 <br /> Building C: Measurement of Floor <br /> Sheathing Damage Building C: Damaged Top of Floor Joist <br /> ITEM#3: BUILDING D-DAMAGED RIM NEAR DOWNSPOUT <br /> At the southeast corner of Building D, DEI observed an approximately six inch wide opening through the fascia and <br /> structural wall sheathing behind. The fascia and framing behind the fascia are wet and damaged. DEI recommends <br /> that the fascia and damaged portions of the wall sheathing are removed to allow for the review of the wood framing. <br /> PAGE 4 OF 6 <br /> g <br />