Laserfiche WebLink
1 <br /> 1 <br /> Double nail studs to sole and top plate, raise frame, nail in sole plate to <br /> wood flooring, nail in top, nail in firestops, add jack studs <br /> and header to new door opening and kitchen half-wall opening, <br /> double stud at adjoining walls & opening, sheetrock, tape, corner, finish. <br /> as <br /> c 2x4 top plate <br /> 4 16" c-c <br /> 2 x 4 studs <br /> 1/2" sheetrock p SHEETROCK : 12" <br /> • <br /> L` 2x4 firestop •1 7" <br /> PLATE <br /> 4" LAG BOLTS W/LAG SHIELD <br /> rt 2x4 sole <br /> 4" nails <br /> 2609A Lombard Ave. Everett, WA <br />