Laserfiche WebLink
City of Everett Stadium Amphitheater Park Project Scope of Work Page 26 <br /> <br />BUDGET <br />The costs for the scope described above are included in the attached budget. Direct costs other <br />than labor include travel, parking, and equipment needed to complete the scope, printing, and <br />other incidental costs. Non-labor direct costs are listed as “Other Direct Costs” in the attached <br />budget.