My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7409 3RD DR W 2023-12-27
>
Address Records
>
3RD DR W
>
7409
>
7409 3RD DR W 2023-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 2:45:20 PM
Creation date
12/14/2023 10:56:55 AM
Metadata
Fields
Template:
Address Document
Street Name
3RD DR W
Street Number
7409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PW2008-032 Description: RETAINING WALL&PLEXIGLASS&CEDAR FENCE <br /> Applied:8/18/2020 Approved: 10/7/2020 Site Address: 7409 3RD DR W <br /> Issued: 10/28/2020 Finaled: City,State Zip Code: EVERETT,WA 98203 <br /> Status:ARCHIVED-NOT FINALED Applicant:WENDY WEAVER <br /> Parent Permit: Owner:WEAVER DAVID&WENDY <br /> Parent Project: Contractor: DEAN BACKHOLM LNGSCP DSGN INC <br /> Details: <br /> RETAINING WALL&PLEXIGLASS&CEDAR FENCE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PW 11- <br /> 3/3/2021 3/3/2021 ROCKERY/RETAININ RANDY ALLEN APPROVAL consult <br /> G WALL <br /> Notes: <br /> consult with contractor for what would be required inspections <br /> PW 11- PARTIAL <br /> 3/11/2021 F3/11/2021 ROCKERY/RETAININ JIM KNAPPERT APPROVAL eTRAKiT Inspection Request <br /> G WALL <br /> Notes: <br /> 3/10/202111:11 AM DEAN BACKHOLM LNGSCP DSGN INC <br /> Contact Name:DEAN BACKHOLM LNGSCP DSGN INC <br /> Site Address:7409 3RD DR W <br /> Phone:4254715405 <br /> e-Mail:dean@deanscape.com <br /> (3/11/202111:22 AM 1HK) <br /> Dug holes for piers,will pour 3-12. <br /> PW 11- EXTENSION <br /> 5/17/2021 5/17/2021 ROCKERY/RETAININ PW INSPECTOR APPROVED eTRAKiT Inspection Request <br /> G WALL <br /> Notes: <br /> 5/16/202110:52 AM DEAN BACKHOLM LNGSCP DSGN INC <br /> The designing structural engineer has visit the finished wall and written a letter confirming that it is built according to his specifications. He has included <br /> his professional engineer's stamp.Is this enough to complete the project?The original excavation inspector indicated that this is all that would be <br /> needed.Please advise, <br /> Contact Name:DEAN BACKHOLM LNGSCP DSGN INC <br /> Site Address:7409 3RD DR W <br /> Phone:4254715405 <br /> e-Mail:dean@deanscape.com <br /> I <br /> Printed:Thursday, 14 December,2023 1 of 1 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.