Laserfiche WebLink
2020 System Development Fee Calculations <br />Permit PW2008-032 <br />Additional Notes: <br />Project Address: 7409 3rd DR W <br />Stormwater system development fees split on two separate permits: ground hard surfaces <br />Project Name: Retaining wall and patio <br />calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Prepared By: Thad Newport Date: 10/7/2020 <br />Sewer District: Everett <br />Outside City Limits? No <br />*Adds a 25%Surcharge <br />Supportive Housing Credit? No <br />*Reduces by 80% <br />Reviewed By: Date: <br />Fee Calculations: <br />Stormwater System Development Fees: <br />Permit #: BXXXX-XXX Type of Construction: <br />Existing Development Adding New + Replaced Hard Surfaces <br />Square Feet of New Plus Replaced Hard Surfaces: <br />SF <br />Stormwater System Dev Fee: <br />$0.00 Add this fee to the Building Permit for roof area hard surfaces. <br />iwater System Development Fees: <br />#: PWXXXX-XXX Type of Construction: <br />Square Feet of New Plus Replaced Hard Surfaces: <br />(Existing Development Adding New+ Replaced Hard Surfaces <br />655 1 SF <br />Stormwater System Dev Fee:l $167.61lAdd this fee to the Public Works Permit for hard surfaces on the ground. <br />