Landau Associates <br /> Once existing extraction well EGW192 has been disconnected from the main conveyance line, the <br /> existing lateral line to the primary force main (along with existing electrical and communications lines) <br /> will be excavated and capped. <br /> The new conveyance line to EGW192R will be constructed in engineered trenches. Piping will be <br /> placed on top of at least 6 inches of bedding material and covered with at least 3.5 ft of select fill. <br /> Trench details are shown on the Construction Drawings (Attachment 1). <br /> Extraction Well Monitoring, Controls, and Power <br /> Extraction well EGW192R will be equipped with a pressure transducer to monitor groundwater levels <br /> within the well.The central control system will be programmed to read and monitor the level and <br /> alter the pumping rate of the extraction pump, as necessary, to maintain the desired groundwater <br /> elevation drawdown in the well for hydraulic control of the groundwater plume. <br /> Pressure indicators and transmitters will be installed at the top of the extraction well riser piping <br /> within the well vault to monitor for excess or sudden declines in water pressure that might indicate a <br /> blockage or a leak in the conveyance system. The central control system will be programmed to signal <br /> an alarm in the event of potential blockage or failure in the conveyance piping and will shut down the <br /> system (and send an alarm) if a leak is detected. <br /> A flow meter and transmitter will also be installed on the piping within the well vault to monitor flow <br /> rates and total extracted volume from the well.The flow meter at the end of the conveyance piping <br /> (in the treatment building) will perform the same function. By data comparison, the programmable <br /> logic controller (PLC) is programed to detect the potential presence of leaks or other failures in the <br /> conveyance piping. Consistent with the rest of the GET system monitoring, the sum of the individual <br /> flow rates from each well versus total combined flow into the treatment system, within a given <br /> tolerance, will be used to determine potential water loss between the extraction wells and treatment <br /> system. <br /> A local control panel proximate to existing well EGW192 has hand-off-auto pump controls, power <br /> disconnects, and lighted displays for pump-on and system alarm indication. New well EGW192R will <br /> connect into the existing control panel for EGW192. Control panel labels and electrical drawings <br /> stored in the control panel will be updated to reflect the new well and its connections. Power to the <br /> well will be run from the Snohomish County Public Utilities District No. 1 (PUD)transformer installed <br /> for the Phase 1 IA north of Seaway Boulevard. Power lines will be run in underground conduits to the <br /> new extraction well. Water lines will be separated from power lines on the primary side of <br /> transformers by at least 3 ft in accordance with the PUD requirements. <br /> EGW192 Relocation Work Plan <br /> Powder Mill Gulch—Boeing Everett Plant 6 October 1, 2020 <br />