My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 9 CITY OF EVERETT PARCEL 2023-12-27
>
Address Records
>
9 CITY OF EVERETT PARCEL
>
9
>
9 9 CITY OF EVERETT PARCEL 2023-12-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:51:52 PM
Creation date
12/14/2023 11:01:08 AM
Metadata
Fields
Template:
Address Document
Street Name
9 CITY OF EVERETT PARCEL
Street Number
9
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landau Associates <br /> Waste Management <br /> Soil cuttings, decontamination water, and development water will be managed in accordance with <br /> Section 2.4 of the Phase 2 IA work plan (LAI 2013) and WAC Chapter 173-303. These measures <br /> include: <br /> • Placing of soil cuttings in lined tubs kids and sampling the soil for disposal. <br /> • Placing of all wastewater into polyethylene totes and treating the water through the Boeing <br /> Everett water treatment system. <br /> Any equipment from existing well EGW192 not used during construction of replacement well <br /> EGW192R will be decontaminated and stored for future reuse or disposed of, as appropriate. <br /> Schedule <br /> The estimated completion schedule for the tasks outlined in this work plan is as follows: <br /> Task or Submittal Date <br /> Review and approval of EGW192 Relocation Work Plan(this report) October 2020 <br /> Decommissioning of existing well EGW192(and removal of associated vault and <br /> wellhead equipment);clearing/grubbing and road improvements in preparation October—November 2020 <br /> for EGW192R drilling/installation <br /> Drilling/installation of replacement well EGW192R October—November 2020 <br /> Construction of wellhead,equipment,associated conveyance line,and <br /> November—December 2020 <br /> control/monitoring systems <br /> Startup and performance testing December 2020—January 2021 <br /> This schedule is contingent on Ecology approval of this work plan and applicable permits and <br /> approvals from City and state agencies. All construction and startup dates are contingent on Ecology <br /> approval no later than mid-October 2020. <br /> Reporting <br /> A brief technical memorandum documenting extraction well replacement field activities and <br /> extraction well startup will be submitted to Ecology within 45 days after installation of the <br /> replacement extraction well. As-built drawings and a log of exploration, well completion log, and well <br /> startup testing data will be provided in the technical memorandum. <br /> EGW192 Relocation Work Plan <br /> Powder Mill Gulch—Boeing Everett Plant 7 October 1, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.