Laserfiche WebLink
Othor exterior flashing details <br />nstallation was inspected for installation per product <br />arer's specifications. <br />inspected were observed to be completed with no outstanding <br />items. <br />Slid ng door installation was inspected for installation per product <br />man facturer's specifications. <br />The areas inspected were observed to be completed with no outstanding <br />com coon items. <br />Wes ther barrier: (Hemv Jumbo Tex 60 minute building paper -two laver) <br />The weather barrier material was inspected for installation to manufacturer's <br />reco runendations and building code. <br />The weather barrier was inspected to assure no tears, gaps or missing areas. <br />Insp ctions were performed for correct overlap of material and sealing of the <br />The ;areas inspected were observed to be completed with no outstanding <br />corn clion items. <br />Win low and sliding door flashing was inspected for correct application of <br />mateis] per product manufacturer's recommendations, builder's <br />spec fications, building code and good industry standards. Flashing was <br />insta led before window and door installation using the Henry system for <br />prod ict installation. <br />The real inspected were observed to be completed with no outstanding <br />com Alan items. <br />Sidir <br />g and trim was inspected for general installation to good industry <br />Prater <br />ces. Siding and trim specifications included caulking of the areas <br />recor <br />intended by manufacturer. <br />The <br />as inspected were observed to be completed with no outstanding <br />come <br />lion items. <br />