Laserfiche WebLink
doors were inspected for installation per builder's specifications. Sills <br />inspected for correct sealing against water intrusion. <br />tress inspected were observed to be completed with no outstanding <br />coon items. <br />envelope penetrations were inspected for correct application of <br />material and sealing at the penetrations. <br />s inspected were observed to be completed with no outstanding <br />m items. <br />Root flashing was inspected for correction application at roof to wall areas <br />and ther flashing areas for installation to building code. <br />The eas inspected were observed to be completed with no outstanding <br />co Ti ion items. <br />d1ding enclosure elements of the building were inspected during the <br />of material application from window flashing to completion of the <br />and sealing of all penetrations. Materials are determined to be <br />;d to specifications, building code and to good industry standards. <br />Submitted by: <br />Diane Glenn <br />Construction Consultants of <br />Washington, LLC <br />Building Enclosure inspector <br />