My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9632 19TH AVE SE C 2023-12-19
>
Address Records
>
19TH AVE SE
>
9632
>
9632 19TH AVE SE C 2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 1:33:15 PM
Creation date
12/19/2023 10:22:29 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9632
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
terior flashing details <br />penetrations <br />nstallation was inspected for installation per product <br />uer's specifications. <br />inspected were observed to be completed with no outstanding <br />items. <br />Sh g door installation was inspected for installation per product <br />man facmrer's specifications. <br />The reas inspected were observed to be completed with no outstanding <br />co ction items. <br />The weather barrier material was inspected for installation to manufacturer's <br />recommendations and building code. <br />The weather barrier was inspected to assure no tears, gaps or missing areas. <br />Inspections were performed for correct overlap of material and sealing of the <br />pene xations. <br />The as inspected were observed to be completed with no outstanding <br />correction items. <br />and sliding door flashing was inspected for correct application of <br />per product manufacturer's recommendations, builder's <br />stions, building code and good industry standards. Flashing was <br />I before window and door installation using the Henry system for <br />installation. <br />� inspected were observed to be completed with no outstanding <br />m items. <br />and trim was inspected for general installation to good industry <br />es. Siding and trim specifications included caulking of the areas <br />nended by manufacturer. <br />!as inspected were observed to be completed with no outstanding <br />ion items. <br />
The URL can be used to link to this page
Your browser does not support the video tag.