Laserfiche WebLink
i doors were inspected for installation per builder's specifications. Sills <br />inspected for correct sealing against water intrusion, <br />areas inspected were observed to be completed with no outstanding <br />%ction items. <br />nvelope penetrations were inspected for correct application of <br />iaterlal and sealing at the penetrations. <br />inspected were observed to be completed with no outstanding <br />items. <br />Roo flashing was inspected for correction application at roof to wall areas <br />and flier flashing areas for installation to building code. <br />The areas inspected were observed to be completed with no outstanding <br />corr areas <br />items. <br />ilding enclosure elements of the building were inspected during the <br />of material application from window flashing to completion of the <br />and sealing of all penetrations. Materials are determined to be <br />;d to specifications, building code and to good industry standards. <br />Submitted by: <br />Diane Glenn <br />Construction Consultants of <br />Washington, LLC <br />Building Enclosure inspector <br />