My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9632 19TH AVE SE C 2023-12-19
>
Address Records
>
19TH AVE SE
>
9632
>
9632 19TH AVE SE C 2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 1:33:15 PM
Creation date
12/19/2023 10:22:29 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9632
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETTWA..IN•,o. <br />0RETTEV® <br />Fire Sprinklers System (NFPA-13 & 13R) <br />Acceptance Test Checklist <br />INFORMATION HANDOUT C-6 <br />:RFMD)Ul <br />General <br />This document's intent is to provide contractors with guidelines outlining the expectations and <br />procedures for how the Everett Fire Marshal's Office will conduct an acceptance test of a fire sprinkler <br />system. This document addresses the most common aspects of a fire sprinkler acceptance tests, in cases <br />where this document does not address a device or operation used with your system IFC, NFPA, and/or <br />Manufacturer Specifications will be used to determine testing criteria. <br />Underground/Flush <br />PA55 FAIL N/A <br />1. Approved Plans - An Approved/Stamped set of plans shall be located at the job El ❑ <br />site. <br />2. Responsibility- Underground supply will be broken into two categories: ❑ ❑ <br />• First will be everything before and up to the approved double check <br />detector assembly which is the responsibility of the Everett Utilities <br />Department to witness and inspect. <br />• Second is everything after the approved double check detector assembly <br />to the fire sprinkler riser which is the responsibility of the Everett Fire <br />Department to witness and inspect. <br />3. NFPA 2A Report- The contractor shall complete, sign, and provided a copy of the ❑ ❑ <br />contralto's material and test certificate to the AHJ. (NFPA 24 Figure 10.10.1.) <br />Hydrostatic Test: <br />Pill FAIL N/A <br />4. Schedule Inspection- The contractor shall schedule for the inspection using El ❑ ❑ <br />eTRAKT online permitting portal. Inspection requests submitted online before <br />11:59 p.m. on Monday -Friday will be tentatively scheduled for the next business <br />day. <br />S. 2Hour Test -A member of the Fire Marshal's Office will contact the contractor to ❑ ❑ ❑ <br />schedule a time for the inspection. The contractor is responsible for verifying that <br />all piping and attached equipment to the system subjected to system working <br />pressure has been under 200 psi of pressure or 50 psi in excess of the system <br />working pressure, whichever is greater, and shall maintain the pressure at+- 5 psi <br />for 2 hours prior to the inspection. Example: Timestamped photograph of pressure <br />gauge. (Loss shall be determined by a drop In the gauge pressure or visual <br />leakage.) <br />Fire Marshal's Office 1 425 257 61 DO I everertwayouv/fire <br />
The URL can be used to link to this page
Your browser does not support the video tag.