My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9632 19TH AVE SE C 2023-12-19
>
Address Records
>
19TH AVE SE
>
9632
>
9632 19TH AVE SE C 2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 1:33:15 PM
Creation date
12/19/2023 10:22:29 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9632
Unit
C
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. <br />Backflll- The trench shall be backfllled between joints before testing to prevent <br />❑ ❑ ❑ <br />movement of pipe. Thrust blacks and or restrained joint systems shall also be left <br />uncovered for inspection. <br />]. <br />Joints- Joints shall be inspected for visua l leakage <br />❑ ❑ ❑ <br />8. <br />Thrust Blocks- Thrust blocks shall be installed as per approved set of plans and <br />❑ ❑ ❑ <br />placed between undisturbed earth and the fitting to be restrained and shall be <br />capable of resisting the calculated thrust forces. Wherever possible, thrust blocks <br />shall be placed so that the joints are accessible for repair. <br />9. <br />Release Pressure- After verifying that he system has maintained the required 200 <br />❑ ❑ ❑ <br />psi for 2 hours, release pressure from the system to verify that the gauge is <br />operating properly. <br />Flushing: <br />PASS FAIL I <br />10. <br />Before Connection- Underground piping, from the water supply to the system <br />❑ ❑ ❑ <br />riser, and lead-in connections to the system riser shall be completely Rushed <br />before the connection is made to downstream fire protection system piping. <br />11. <br />Pre -Flushing - Pre -flushing shall be conducted by the contractor to ensure all <br />❑ ❑ ❑ <br />foreign materials have been Rushed from the system prior to the fire inspector <br />conducting the official flush test. <br />12. <br />Flushing Operations- Flushing operations shall be set-up and conducted <br />❑ ❑ ❑ <br />complying with the following: <br />• The discharge used for the flush shall be located in close proximity of the <br />lead-in connection to the system riser. <br />• Water shall be discharged through an open ended 4-inch pipe or through <br />a 4-inch pipe connected to a Y or siamese connection with two 2 % inch <br />hoses. <br />• There shall be two burlap bags connected to each outlet. <br />• Flow rate shall be at a minimum of 390 gpm. <br />• See the examples 1,2, and 3 of the acceptable configurations for flushing <br />of the system <br />13. 10-Minute Cycles- The fire inspector will conduct the flush test in 10-minute ❑ ❑ ❑ <br />cycles, after each cycle the inspector will inspect the burlap bags located at the <br />outlets for foreign materials. These cycles will continue until water is clear and the <br />bags are free of all foreign materials. Note: After two cycles, if significant <br />materials are still present in the bags the inspector will reschedule the remainder <br />of the testfor a different time to allow for the contractor to continue pre flushing <br />the system. <br />Fire Marshal's Office 14252576100 I everenwa.gov/fire I INFORMATION HANDOUT C-6 14.13,2020 1 Pege2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.