Laserfiche WebLink
Project Narrative — EFR <br />DAGMAR (L-Sub6) — VERIZON <br />Page 4 of 4 <br />In sum, the modification clearly qualifies as an "eligible facilities request" under the Spectrum <br />Act and FCC rules, because it does not exceed any of the thresholds such that it would <br />"substantially change" the physical dimensions of the existing tower. Failure to process this <br />eligible facilities request and approve all necessary permits within 60 days may result in the <br />request being deemed granted by operation of law. <br />147 U.S.C. § 1455(a)(1). <br />147 U.S.C. § 1455(a)(2). <br />I See Report and Order FCC 14-153, 29 FCC Rcd. 12865 (FCC October 17, 2014); see also Report and <br />Order FCC 20-153, 2020 WL 6501650 (FCC October 27, 2020). <br />4 See 47 C.F.R. § 1.6100(c)(2), (3). <br />5 Declaratory Ruling 20-75, 35 FCC Rcd 5977, ¶ 16 (FCC June 9, 2020). <br />6See 47 C.F.R. § 1.6100(c)(1). <br />7 See 47 C.F.R. § 1.6100(c)(4). <br />'See 47 C.F.R. § 1.6100(b)(7). <br />