Laserfiche WebLink
467 Swan Avenue, Hohenwald,TN 38462 <br /> Phone : (800) 284-7437 <br /> Fax: (931) 796-8811 <br /> olivertech nologies.com <br /> Installation Instructions for 1100 "V" Series All Steel Foundation System <br /> SPECIAL CIRCUMSTANCES: If following conditions occur"STOPI Contact Oliver Technologies at 1-800-284-7437 for further instructions: <br /> a) Pier(system) height exceeds 48" b) Roof eaves exceed 16" c) Roof pitch greater than 7/12 d) Location is within 1500 feet of coastline <br /> e) Soil conditions less than 4B f) Thick and wide I Beam attachments are available. <br /> INSTALLATION OF GROUND PAN FOR DIRT SET (IV) <br /> 1) Remove weeds and debris in an approximate three foot square to expose firm, level undisturbed soil or controlled fill for each ground pan.The <br /> 1100 V Pan is equivalent to a 21 x 21 footing. Top of ground pan (C)must be installed at ground level or per local jurisdiction. <br /> 2) Place center ground pan (C)directly below chassis I-beam. Press or drive pan completely into soil until flush with or below soil. <br /> SPECIAL NOTE: The longitudinal"V" brace system serves as a pier under the home and should be loaded as any other pier. It is recommended that <br /> after leveling piers,and one-half inch (1/2")before home is lowered completely onto piers, complete items 3 through 7 below. <br /> INSTALLATION OF LONGITUDINAL"V" BRACE SYSTEM <br /> 3) Select the correct square tube brace (E)length for set-up(pier)height at support location. <br /> PIER HEIGHT 1.5" <br /> (Approx.40-60 degrees Max.) Tube Length <br /> 14" to 18" 20" <br /> 18"to 25" 28" 0.75" <br /> 24"to 35" 39" <br /> 3 " to 40" 4" <br /> 36 5 <br /> " to 48" 4" <br /> PIER HEIGHT=the dimension from the top of the pan <br /> to the bottom of the I-Beam 9/16"DIa. (.562)hole 0.75 <br /> 4) Install both of the 1 5"square tubes(E) into the "V"bracket(J), insert carriage bolt and leave nut loose for final adjustment. <br /> 5) Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 6) Attach the selected 1.5"tubes(E)to the I-beam connectors(F)and fasten loosely with bolts and nuts. NOTE. The ground pan must be level in <br /> both directions to ensure the angle markings on the center point connector are correct from the horizontal plane of the pan. The angle is not to <br /> exceed 60 degrees and not less than 40 degrees. The"V"bracket(J)is stamped with the angles to verify correct degree Use proper length tube <br /> or cut and drill tube to achieve proper length. (The tube may be cut using any appropriate steel cutting method such as steel saw,cutting torch, <br /> etc. New holes must be drilled to the dimension and at the location as shown for part(E), <br /> 7) Using standard hand tools,tighten all nuts and bolts. When connecting the brace tube to the model 1100-10-P I-beam connector bracket,tighten <br /> at least one and a half to two full turns past hand tight. <br /> INSTALLATION OF (LATERAL)TELESCOPING TRANSVERSE ARM SYSTEM(1100 ITV) <br /> 8) Select the correct transverse arm(H). The 60"sections are standard.The 72"sections are used on frame widths greater than 99.5". <br /> 9) Install the 1.5"transverse brace(H)to the ground pan connector(D)with the bolt and nut. <br /> 10) Slide 1.25"transverse brace into the 1.5"brace and attach to adjacent I-beam connector(I)with bolt and nut. <br /> 11) Secure 1.5"transverse arm to 1 25"transverse arm using four(4) 1/4"- 14 x 3/4"self-tapping screws in pre-drilled pilot holes. <br /> INSTALLATION USING CONCRETE (ICV) <br /> The concrete footer, runner or slab may be of any shape,that has a minimum of 2900 cu. in.,with a minimum depth of 3.5"(dry set)or 6"(wet set), at <br /> each system location. The surface of the footing shall be large enough to support the pier load and allow at least 4"from the concrete bolt to the edge <br /> of the concrete (ie 22"x22"x6" footer).The concrete shall be a minimum of 2500 psi mix (pre-blended sacked concrete mix is acceptable). Special <br /> inspection of footing is not required If the 1100 ITC transverse system, (D (W or D)bracket only)is to be installed without the use of the 1100 ILC (V) <br /> longitudinal system (J (W or D) bracket), it MUST be installed within 18" of pier. <br /> NOTE: The bottom of all footings,pads,slabs and runners must be per local jursidiction. <br /> LONGITUDINAL(V) <br /> When using the 1100 wet set J(W)bracket,simply install the bracket in runner/footer OR when installing in cured concrete, use the 1100 dry set J(D) <br /> bracket.The 1100 dry set J(D)bracket is attached to the concrete using (2) 1/2"X 3"concrete wedge bolts Place the bracket in desired location.Mark <br /> bolt hole locations,then using a 1/2"masonry bit, drill a hole to a minimum depth of 3". Be sure all dust is blown out of the holes. Place wedge bolts into <br /> drilled holes,then place 1100 J(D)bracket onto wedge bolts and start wedge bolt nuts. Take a hammer and lightly drive the wedge bolts down by hitting <br /> the nut(Do not hit the top of threads on bolt). Complete by tightening the nuts. <br /> LATERAL(Transverse Arm) <br /> For wet set installation set the transverse connector bracket D(W)into runner/footer at desired location. For dry set installations,the transverse connector <br /> bracket D(D)is attached to the concrete using(2) 1/2"X 3"concrete wedge bolts.Mark bolt hole locations,then using a 1/2"masonry bit,drill a hole to a <br /> minimum depth of 3" Be sure all dust is blown out of the holes. Place wedge bolts into drilled holes,then place transverse connector bracket J(D)bracket <br /> onto wedge bolts and start wedge bolt nuts. Take a hammer and lightly drive the wedge bolts down by hitting the nut(Do not hit the top of threads on <br /> bolt.)Complete by tightening the nuts. <br /> Revised 03/17/2020 PATENT# 6634150 and other patents pending Page 2/3 <br />