My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2713 MAPLE ST A & B 2024-01-08
>
Address Records
>
MAPLE ST
>
2713
>
2713 MAPLE ST A & B 2024-01-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 4:11:24 PM
Creation date
12/21/2023 10:04:39 AM
Metadata
Fields
Template:
Address Document
Street Name
MAPLE ST
Street Number
2713
Unit
A & B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
orsrt9e-4- M <br /> Fes, rcto o,✓ a 21/4 g1/7,,zZ <br /> Mr. Ismail Mohammad <br /> 2713 Maple Street, LLC <br /> Plan Check Number: B2101-051, First Building Review <br /> May 3, 2021 <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Architectural <br /> General: <br /> 1. Sheet 1 lists the applicable building codes for the project. See IBC Section 107.2.1. The <br /> following comments should be addressed: <br /> a. The codes should specify the editions. See the EMC Section 16.005.030. <br /> b. The proposed project does not comply with the scope limitations of IRC Section R101.2. <br /> The IRC should be removed from the list. <br /> The Proposed Project has been adjusted to be a duplex and comply with the IRC. Sections and <br /> references to IRC can be found on sheet A0.0 Cover Sheet. <br /> 2. The project includes references to the IRC throughout the construction drawing set. The <br /> drawings should be revised to reference the IBC and other applicable codes. All references to <br /> the IRC should be removed. See IBC Section 107.2.1. <br /> The Proposed Project has been adjusted to be a duplex and comply with the IRC. <br /> 3. The building occupancy classification should be specified in the drawings. See IBC Section <br /> 302.1. <br /> Building occupancy R-3 has been added to Sheet A0.0 Cover Sheet. <br /> 4. The building Construction Type should be specified in the drawings. The building is presumed <br /> to be Type VB construction; please verify. See IBC Section 602.1. <br /> Construction Type VB has been added to Sheet A0.0 Cover Sheet. <br /> Fire Protection: <br /> 5. The building is required to include an automatic fire sprinkler system. See IBC Section 903.2.8. <br /> The Proposed Project has been adjusted to be a duplex and comply with the IRC. Does not require <br /> to include an automatic fire sprinkler system. <br /> 6. The Site Plan on Sheet 1 appears to indicate a minimum separation between the buildings of <br /> 11'-4". The following comments should be addressed: <br /> 0 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.