Laserfiche WebLink
Mr. Dave Marlow <br /> Integrity Custom Builders LLC <br /> Plan Check Number: B2107-048, First Building Review <br /> August 12, 2021 <br /> Structural <br /> The fastening requirements for framing are not included in the construction drawings. The <br /> structural drawings should include a schedule of fasteners per Table R602.3(1). Note that <br /> providing a reference to this table in the drawings does not satisfy this requirement. See S-5.0 <br /> 2. The construction drawings should specify a minimum of one king and one jack stud at each end of <br /> beams and headers. Additional studs should be specified as required. See Section R602.7.4. <br /> Already on sheet 2 — Roof framing <br /> /-The required length for the shear walls, as determined by analysis, should be specified in the Floor <br /> Plan on Sheet 1. See Section R301.1.3 and IBC Sections 107.2.1 and 1603.1. See sht 1 <br /> 4. The Floor Plan on Sheet 1 appears to indicate 2x10 "Loft"framing spanning in the east-west <br /> direction. See Section R106.1.1. The following comments should be addressed: <br /> /a! Section A/Sheet 2 appears to show the framing spanning in the north-south direction. The <br /> drawings should be revised for consistency. A/2 drawing is consistent <br /> J' The east-west orientation appears to require additional headers, notably at the closet window. <br /> The bathroom doorway appears to indicate a header; the framing should be clearly shown in <br /> the plans. 4x8 hdr typ ono — clearly sated on the plan already — See sht2 — Roof framing <br /> c. Section A/Sheet 2 references a "Ledger"detail that is not provided. The"Ledger Detail"on <br /> Sheet 3 is for attachment of a deck to a house via the rim joist, and is not applicable. <br /> See Section A/2. <br /> 5. The building includes cantilever sheathing along the rake edges of the roof. The following <br /> comments should be addressed: <br /> a. The rake dimension should be specified in the drawings. See Section R106.1.1. <br /> b. The rake is required to be provided with structural support if it exceeds 9 inches. A detail for <br /> this condition should be included in the construction drawings. The detail should provide <br /> sufficient backspan and connections for the framing to support the design roof loads. See <br /> Sections R301.1 and R803.2.3. <br /> Full height studs required at sideiNalls, see page#10 of talcs, use 2x6 HF2 16" D.C. <br /> See detail 1/S-5.0 of outiooker. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Lauren. <br /> American Home Planners <br /> 2716 Colby Avenue, Everett WA 98201 <br /> (425) 258-6400 <br /> plcns d ainericanhorneplanners.com <br /> 3200 Cedar Street , 425.257.8810 everetteps@everettwa.gov -- <br /> - WA 98201 425.257.8857 fax = everettwa.gov/permits <br /> oi5 � <br />