Laserfiche WebLink
Flow Test / Final Inspection <br />Flow Test (Bucket Test): <br />PASS FAIL N/A <br />1. Test -A functional flow test (bucket test) shall be performed on all NFPA 13D El El F-1 <br />systems to ensure that the sprinkler system will function as designed and will <br />deliver a sufficient quantity of water to meet all flow and listing requirements. <br />2. Hydraulic Placard- Locate the hydraulic placard on the riser and compare it the El El F-1 <br />approved set of plans and hydraulic calculations to determine the required gpm <br />and the most remote two sprinkler heads. <br />Required hydraulically calculated gpm <br />3. Equipment StSet-Up- Prior to the Fire l nspector's arrival, the sprinkler contractor ❑ ❑ ❑ <br />shall provide and set up the following: <br />1. Verify that the sprinkler control valve is closed. <br />2. Drain the system piping. <br />3. Remove the two most remote heads from the system. <br />4. Install pipes with two %turn ball valve. <br />5. Install "test heads" in the end of the pipes (must be identical to system <br />heads(. <br />6. Install 200 psi pressure gauge. <br />7. Place two calibrated 55-gallon drums underneath the sprinkler heads <br />PRESSURE GAUGE <br />PIPE EXTENSION <br />BUSHING —BALLVALVE <br />—TEST SPRINICER HEAD <br />BRANCH -F <br />l UI 1 <br />I•I PIPE TO gRECT WATER <br />SUPPLY PIPING <br />TESTASSEMBLY <br />—r Isee detail atrore) <br />Fire Marshal's Office 142525701 DO I everettwa.govlfire I INFORMATION HANDOUT C 7 I4.20,2020I Pages <br />