Laserfiche WebLink
4. <br />Record Pressures - Recordstatic pressure, then flow both valves simultaneously <br />❑ <br />❑ <br />for 30 seconds and record residual pressure while flowing. <br />Static Pressure Residual Pressure <br />5. <br />Amount of Water- Measure the amount of water Rowed into a calibrated 55- <br />❑ <br />❑ <br />gallon drums. <br />Drum#1 Gallons Drum#2 Gallons <br />6. <br />Calculate GPM- Verify Row rates meet or exceed required hydraulically calculated <br />❑ <br />❑ <br />❑ <br />gpm. <br />Total Gallons Flowed %2= > _ Required gpm. <br />Final Inspection: <br />PASS <br />FAIL <br />N/A <br />7. <br />Schedule- A final inspection should be performed when the house is complete, <br />❑ <br />❑ <br />❑ <br />or nearly complete. <br />S. <br />Approved Plans- Approved plans on site? And all work completed Per plans? <br />❑ <br />❑ <br />❑ <br />9. <br />Head Inspection- All sprinkler heads shall be uncovered, with escutcheons or trim <br />❑ <br />❑ <br />❑ <br />rings in place. For concealed heads, the cover plates shall be off. <br />10. <br />Obstructions- Verify that no architectural features have been constructed or <br />❑ <br />❑ <br />❑ <br />installed that will obstruct the coverage from the sprinkler discharge or result in a <br />change of sprinkler coverage. <br />11. <br />ProtectiveCovers - Check to see that all protective coverings are removed for <br />❑ <br />❑ <br />❑ <br />sprinklers heads. <br />12. <br />Palmed Heads- Ensure that sprinklers or cover plates on concealed sprinklers <br />❑ <br />❑ <br />❑ <br />have not been painted by anyone other than the sprinkler manufacturer. <br />13, <br />Verify Pressure Gauges - Verify that the pressure gauge provided on the riser is at <br />❑ <br />❑ <br />❑ <br />the minimum required pressure and ensure that the system is fully operational. <br />14. <br />NFPA 13D Report- The installer shall complete and sign the contractor's material <br />❑ <br />❑ <br />❑ <br />and test certificate prior to final approval of the system. <br />15. <br />Address- Verify that the address to the building is posted and in compliance with <br />❑ <br />❑ <br />❑ <br />the requirement for the City of Everett. <br />16. <br />Fire Department Access- Ensure that fire department access is posted and meets <br />❑ <br />❑ <br />the requirements for the City of Everett. <br />Fire Marshal's Office 142525761 DO I evereteva.gov/fire I INFORMATION HANDOUT C 7 I4.20,2020I Page <br />