Laserfiche WebLink
SITE ACTIVITY REQUIREMENTS: GENERAL NOTES: • <br /> 1. NOTICE TO PROCEED - NO WORK SHALL COMMENCE PRIOR TO CONTRACTOR RECEIVING A WRITTEN NOTICE TO PROCEED 1.FOR THE PURPOSE OF CONSTRUCTION DRAWING,THE FOLLOWING DEFINITIONS SHALL APPLY: <br /> (NTP)AND THE ISSUANCE OF A PURCHASE ORDER. PRIOR TO ACCESSING/ENTERING THE SITE YOU MUST CONTACT THE DISH Wheless d ...., sh <br /> CONTRACTOR:GENERAL CONTRACTOR RESPONSIBLE FOR CONSTRUCTION <br /> L.L.C.AND TOWER OWNER NOC&THE DISH Wireless L.L.C.AND TOWER OWNER CONSTRUCTION MANAGER. <br /> CARRIER:DISH Wireless L.L.C. NW <br /> 2. "LOOK UP'- DISH Wireless L.L.C.AND TOWER OWNER SAFETY CLIMB REQUIREMENT: <br /> TOWER OWNER:TOWER OWNER wireless_ <br /> THE INTEGRITY OF THE SAFETY CLIMB AND ALL COMPONENTS OF THE CLIMBING FACILITY SHALL BE CONSIDERED DURING ALL STAGES <br /> OF DESIGN, INSTALLATION,AND INSPECTION.TOWER MODIFICATION, MOUNT REINFORCEMENTS,AND/OR EQUIPMENT INSTALLATIONS SHALL 2. THESE DRAWINGS HAVE BEEN PREPARED USING STANDARDS OF PROFESSIONAL CARE AND COMPLETENESS NORMALLY <br /> NOTEXERCISED UNDER SIMILAR CIRCUMSTANCES BY REPUTABLE ENGINEERS IN THIS OR SIMILAR LOCALITIES. IT IS ASSUMED THAT THE <br /> THE COMPROMISE THE INTEGRITY OR FUNCTIONAL USE OF THE SAFETY CLIMB OR ANY COMPONENTS OF THE CLIMBING FACILITY ON 5]01 SOUTH.CO FE DRIVE <br /> THE STRUCTURE.THIS SHALL INCLUDE, BUT NOT BE LIMITED TO: PINCHING OF THE WIRE ROPE,BENDING OF THE WIRE ROPE FROM WORK DEPICTED WILL BE PERFORMED BY AN EXPERIENCED CONTRACTOR AND/OR WORKPEOPLE WHO HAVE A WORKING KNOWLEDGE 1SOUTH N 8FED <br /> ITS SUPPORTS, DIRECT CONTACT OR CLOSE PROXIMITY TO THE WIRE ROPE WHICH MAY CAUSE FRICTIONAL WEAR, IMPACT TO THE OF THE APPLICABLE CODE STANDARDS AND REQUIREMENTS AND OF INDUSTRY ACCEPTED STANDARD GOOD PRACTICE. AS NOT EVERY <br /> ANCHORAGE POINTS IN ANY WAY.OR TO IMPEDE/BLOCK ITS INTENDED USE.ANY COMPROMISED SAFETY CLIMB. INCLUDING EXISTING CONDITION OR ELEMENT IS (OR CAN BE) EXPLICITLY SHOWN ON THESE DRAWINGS,THE CONTRACTOR SHALL USE INDUSTRY ACCEPTED <br /> CONDITIONS MUST BE TAGGED OUT AND REPORTED TO YOUR DISH Wireless L.L.C. AND DISH Wireless L.L.C.AND TOWER OWNER POC STANDARD GOOD PRACTICE FOR MISCELLANEOUS WORK NOT EXPLICITLY SHOWN. <br /> OR CALL THE NOC TO GENERATE A SAFETY CLIMB MAINTENANCE AND CONTRACTOR NOTICE TICKET. 3. THESE DRAWINGS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE MEANS OR METHODS OF I <br /> 3. PRIOR TO THE START OF CONSTRUCTION.ALL REQUIRED JURISDICTIONAL PERMITS SHALL BE OBTAINED.THIS INCLUDES, BUT CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS,TECHNIQUES. �(\ <br /> IS NOT LIMITED TO,BUILDING, ELECTRICAL, MECHANICAL,FIRE,FLOOD ZONE, ENVIRONMENTAL,AND ZONING. AFTER ONSITE ACTIVITIES SEQUENCES,AND PROCEDURES. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY FOR PROTECTION OF LIFE AND `� <br /> AND CONSTRUCTION ARE COMPLETED,ALL REQUIRED PERMITS SHALL BE SATISFIED AND CLOSED OUT ACCORDING TO LOCAL PROPERTY DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE,BUT NOT BE LIMITED TO. BRACING, FORMWORK,SHORING, ETC. <br /> JURISDICTIONAL REQUIREMENTS. SITE VISITS BY THE ENGINEER OR HIS REPRESENTATIVE WILL NOT INCLUDE INSPECTION OF THESE ITEMS AND IS FOR STRUCTURAL 1 <br /> 4. ALL CONSTRUCTION MEANS AND METHODS; INCLUDING BUT NOT LIMITED TO, ERECTION PLANS, RIGGING PLANS,CLIMBING OBSERVATION OF THE FINISHED STRUCTURE ONLY. CAMP+ <br /> PLANS,AND RESCUE PLANS SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR RESPONSIBLE FOR THE EXECUTION OF 4. NOTES AND DETAILS IN THE CONSTRUCTION DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. ASSOCIATES <br /> THE WORK CONTAINED HEREIN,AND SHALL MEET ANSI/ASSE A10.48(LATEST EDITION); FEDERAL.STATE,AND LOCAL REGULATIONS; WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFORM TO SIMILAR WORK ON THE PROJECT,AND/OR AS PROVIDED FOR IN <br /> AND ANY APPLICABLE INDUSTRY CONSENSUS STANDARDS RELATED TO THE CONSTRUCTION ACTIVITIES BEING PERFORMED.ALL RIGGING THE CONTRACT DOCUMENTS. WHERE DISCREPANCIES OCCUR BETWEEN PLANS, DETAILS, GENERAL NOTES,AND SPECIFICATIONS,THE 19616N.CREEK PKWV.SUITE 220 <br /> PLANS SHALL ADHERE TO ANSI/ASSE A10.48(LATEST EDITION)AND DISH Wireless L.L.C.AND TOWER OWNER STANDARDS, INCLUDING GREATER, MORE STRICT REQUIREMENTS,SHALL GOVERN. IF FURTHER CLARIFICATION IS REQUIRED CONTACT THE ENGINEER OF BOTHELL,WA 98011 <br /> THE REQUIRED INVOLVEMENT OF A QUALIFIED ENGINEER FOR CLASS N CONSTRUCTION,TO CERTIFY THE SUPPORTING STRUCTURE(S)IN RECORD. PHONE.I42SI700-6392 <br /> W W W.CAMPASSOC.COM <br /> ACCORDANCE WITH ANSI/TIA-322 (LATEST EDITION). 5. SUBSTANTIAL EFFORT HAS BEEN MADE TO PROVIDE ACCURATE DIMENSIONS AND MEASUREMENTS ON THE DRAWINGS TO ASSIST <br /> 5. ALL SITE WORK TO COMPLY WITH DISH Wireless L.L.C.AND TOWER OWNER INSTALLATION STANDARDS FOR CONSTRUCTION IN THE FABRICATION AND/OR PLACEMENT OF CONSTRUCTION ELEMENTS BUT IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO <br /> ACTIVITIES ON DISH Wireless L.L.C.AND TOWER OWNER TOWER SITE AND LATEST VERSION OF ANSI/TIA-1019-A-2012 STANDARD FOR FIELD VERIFY THE DIMENSIONS, MEASUREMENTS,AND/OR CLEARANCES SHOWN IN THE CONSTRUCTION DRAWINGS PRIOR TO <br /> INSTALLATION,ALTERATION,AND MAINTENANCE OF ANTENNA SUPPORTING STRUCTURES AND ANTENNAS." FABRICATION OR CUTTING OF ANY NEW OR EXISTING CONSTRUCTION ELEMENTS. IF IT IS DETERMINED THAT THERE ARE <br /> DISCREPANCIES AND/OR CONFLICTS WITH THE CONSTRUCTION DRAWINGS THE ENGINEER OF RECORD IS TO BE NOTIFIED AS SOON AS <br /> 6. IF THE SPECIFIED EQUIPMENT CAN NOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONTRACTOR SHALL PROPOSE POSSIBLE. <br /> AN ALTERNATIVE INSTALLATION FOR APPROVAL BY DISH Wireless L.L.C.AND TOWER OWNER PRIOR TO PROCEEDING WITH ANY SUCH �f ]'-Y <br /> CHANGE OF INSTALLATION. 6. PRIOR TO THE SUBMISSION OF BIDS,THE BIDDING CONTRACTOR SHALL VISIT THE CELL SITE TO FAMILIARIZE WITH THE C . <br /> EXISTING CONDITIONS AND TO CONFIRM THAT THE WORK CAN BE ACCOMPLISHED AS SHOWN ON THE CONSTRUCTION DRAWINGS.ANY ! A 3' <br /> 7. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS DISCREPANCY FOUND SHALL BE BROUGHT TO THE ATTENTION OF CARRIER POE AND TOWER OWNER. 7 s� <br /> AND ORDINANCES.CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND COMPLY WITH ALL LAWS,ORDINANCES,RULES, 7 ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS <br /> DOTU S MP LAWFUL LL OF APPLICABLEANYPUBLIC AUTHORITY REGARDING THE PERFORMANCESAND OF THE WORK.ALL WORK COCADES, <br /> AND ORDINANCES. CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND COMPLY WITH ALL LAWS,ORDINANCES, RULES, •.4���'- i'R <br /> OUT SHALL COMPLY APPLICABLE WITH ALL LATION MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS LOCAL JURISDICTIONAL CODES, REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY REGARDING THE PERFORMANCE OF THE WORK.ALL WORK CARRIED X1oe WOe <br /> ORDINANCES AND REGULATIONS. OUT SHALL COMPLY WITH ALL APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS AND LOCAL JURISDICTIONAL CODES, <br /> 8. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS ORDINANCES AND APPLICABLE REGULATIONS. <br /> UNLESS SPECIFICALLY STATED OTHERWISE. 8. UNLESS NOTED OTHERWISE,THE WORK SHALL INCLUDE FURNISHING MATERIALS, EQUIPMENT,APPURTENANCES AND LABOR <br /> 9. THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES INCLUDING PRIVATE LOCATES SERVICES PRIOR TO THE START NECESSARY TO COMPLETE ALL INSTALLATIONS AS INDICATED ON THE DRAWINGS. EER <br /> OF CONSTRUCTION. 9. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS To ALTER Tars DOCUMENT <br /> 10. ALL EXISTING ACTIVE SEWER,WATER, GAS, ELECTRIC AND OTHER UTILITIES WHERE ENCOUNTERED IN THE WORK,SHALL BE UNLESS SPECIFICALLY STATED OTHERWISE. <br /> PROTECTED AT ALL TIMES AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE WORK, SHALL BE RELOCATED AS DIRECTED BY DRAWN BY: CHECKED BY:APPROVED BY. <br /> CONTRACTOR. EXTREME CAUTION SHOULD BE USED BY THE CONTRACTOR WHEN EXCAVATING OR DRILLING PIERS AROUND OR NEAR 10. IF THE SPECIFIED EQUIPMENT CAN NOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONTRACTOR SHALL PROPOSE <br /> AN ALTERNATIVE INSTALLATION FOR APPROVAL BY THE CARRIER AND TOWER OWNER PRIOR TO PROCEEDING WITH ANY SUCH CHANGE JAC JAC JAC <br /> UTILITIES. CONTRACTOR SHALL PROVIDE SAFETY TRAINING FOR THE WORKING CREW.THIS WILL INCLUDE BUT NOT BE LIMITED TO A) <br /> FALL PROTECTION B)CONFINED SPACE C) ELECTRICAL SAFETY D)TRENCHING AND EXCAVATION E) CONSTRUCTION SAFETY OF INSTALLATION. <br /> REDS REV p. --- <br /> PROCEDURES. 11. CONTRACTOR IS TO PERFORM A SITE INVESTIGATION, BEFORE SUBMITTING BIDS,TO DETERMINE THE BEST ROUTING OF ALL <br /> CONDUITS FOR POWER,AND TELCO AND FOR GROUNDING CABLES AS SHOWN IN THE POWER,TELCO,AND GROUNDING PLAN CONSTRUCTION <br /> 11. ALL SITE WORK SHALL BE AS INDICATED ON THE STAMPED CONSTRUCTION DRAWINGS AND DISH PROJECT SPECIFICATIONS, DRAWINGS. <br /> LATEST APPROVED REVISION. DOCUMENTS <br /> 12. THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING AND STRUCTURES.ANY <br /> 12. CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL, DEBRIS,AND TRASH AT THE COMPLETION OF DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF DISH Wireless L.L.C.AND TOWER OWNER <br /> THE WORK. IF NECESSARY, RUBBISH, STUMPS.DEBRIS.STICKS, STONES AND OTHER REFUSE SHALL BE REMOVED FROM THE SITE AND SUBMITTALS <br /> DISPOSED OF LEGALLY. 13. CONTRACTOR SHALL LEGALLY AND PROPERLY DISPOSE OF ALL SCRAP MATERIALS SUCH AS COAXIAL CABLES AND OTHER ITEMS REV DATE DESCRIPTION <br /> 13. ALL EXISTING INACTIVE SEWER,WATER, GAS, ELECTRIC AND OTHER UTILITIES,WHICH INTERFERE WITH THE EXECUTION OF THE REMOVED FROM THE EXISTING FACILITY.ANTENNAS REMOVED SHALL BE RETURNED TO THE OWNER'S DESIGNATED LOCATION. A 10/1e/2022 ELECTRICAL RENSIONS <br /> WORK,SHALL BE REMOVED AND/OR CAPPED,PLUGGED OR OTHERWISE DISCONTINUED AT POINTS WHICH WILL NOT INTERFERE WITH 14. CONTRACTOR SHALL LEAVE PREMISES IN CLEAN CONDITION.TRASH AND DEBRIS SHOULD BE REMOVED FROM SITE ON A DAILY A 1 0/28/2OW SOLES <br /> ISSUED FOR <br /> MAL <br /> A <br /> THE EXECUTION OF THE WORK,SUBJECT TO THE APPROVAL OF DISH Wireless L.L.C.AND TOWER OWNER,AND/OR LOCAL UTILITIES. BASIS. 11/07/2022 ISSUED FOR r IT cm <br /> 8 2/14/2023 M <br /> 14. THE CONTRACTOR SHALL PROVIDE SITE SIGNAGE IN ACCORDANCE WITH THE TECHNICAL SPECIFICATION FOR SITE SIGNAGE ♦ M/IN/2ozr REVISED E eSerr LOCATION <br /> BY LOCAL JURISDICTION AND SIGNAGE REQUIRED ON INDIVIDUAL PIECES OF EQUIPMENT, ROOMS,AND SHELTERS. A 0/22/NOW murD FOR MAL <br /> 15. THE SITE SHALL BE GRADED TO CAUSE SURFACE WATER TO FLOW AWAY FROM THE CARRIER'S EQUIPMENT AND TOWER AREAS. A 0/27/2013 mum rw FINAL <br /> 16. THE SUB GRADE SHALL BE COMPACTED AND BROUGHT TO A SMOOTH UNIFORM GRADE PRIOR TO FINISHED SURFACE ATE PROJECT NUMBER <br /> APPLICATION. SESEA00377C <br /> 17. THE AREAS OF THE OWNERS PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER,EQUIPMENT OR <br /> DRIVEWAY,SHALL BE GRADED TO A UNIFORM SLOPE,AND STABILIZED TO PREVENT EROSION AS SPECIFIED ON THE CONSTRUCTION DISH Wireless L.L.C. <br /> PROJECT INFORMATION <br /> DRAWINGS AND/OR PROJECT SPECIFICATIONS. <br /> 18. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO EXISTING SITE DURING CONSTRUCTION.EROSION CONTROL MEASURES, IF SESEA00377C <br /> REQUIRED DURING CONSTRUCTION,SHALL BE IN CONFORMANCE WITH THE LOCAL GUIDELINES FOR EROSION AND SEDIMENT CONTROL. 2930 WETMORE AVENUE <br /> EVERETT, WA 98201 <br /> 19. THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS. LANDSCAPING AND STRUCTURES.ANY <br /> DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF OWNER. <br /> SHEET TITLE <br /> 20. CONTRACTOR SHALL LEGALLY AND PROPERLY DISPOSE OF ALL SCRAP MATERIALS SUCH AS COAXIAL CABLES AND OTHER ITEMS <br /> REMOVED FROM THE EXISTING FACILITY.ANTENNAS AND RADIOS REMOVED SHALL BE RETURNED TO THE OWNER'S DESIGNATED GENERAL NOTES <br /> LOCATION. <br /> 21. CONTRACTOR SHALL LEAVE PREMISES IN CLEAN CONDITION.TRASH AND DEBRIS SHOULD BE REMOVED FROM SITE ON A DAILY SHEET NUMBER <br /> BASIS. <br /> 22. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW OR ICE SHALL NOT GN-2 <br /> BE PLACED IN ANY FILL OR EMBANKMENT. <br /> DISH Wireless LL.C.TEMPLATE VERSION OS-10/29/2021 <br />