My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW FORMOST FUJI 2024-10-07
>
Address Records
>
80TH ST SW
>
905
>
FORMOST FUJI
>
905 80TH ST SW FORMOST FUJI 2024-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2024 12:02:02 PM
Creation date
12/26/2023 11:24:08 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
FORMOST FUJI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT <br />WASHINGTON <br />February 3, 2023 <br />CITY OF EVERETT <br />Permit Services <br />Mr. Harold Christensen <br />Lance Mueller & Associates <br />130 Lakeside, Suite 250 <br />Seattle, WA 98122 <br />Email Address: haroldc@lmueller.com <br />RE: Owner: Formost Fuji <br />Job Address: 905 80th Street SW <br />Plan Check Number: B2301-011, First Building Review <br />Dear Mr. Christensen, <br />The proposed project has been reviewed for compliance with the provisions of the building codes <br />adopted and amended by the state of Washington and the city of Everett. The comments below <br />must be addressed before a permit can be issued. These comments address building issues only. <br />Additional revisions or additions may be required by other departments including Public Works, <br />Planning, and Fire. <br />Code citations provided in the following review comments reference the Everett Municipal Code <br />(EMC), the 2018 International Building Code (IBC), the 2018 International Existing Building Code <br />(IEBC), 2018 the Washington State Energy Code (WSEC), and the 2018 International Mechanical <br />Code (IMC). Additional reference standards are listed in IBC Chapter 35. Amendments to the <br />adopted building codes by Washington Administrative Code (WAC) Title 51 are incorporated into <br />the referenced code citations. <br />In order for the processing of your application to continue, the following documentation shall be <br />submitted to the Building Division for review: <br />a. Itemized letter addressing the comments provided below. <br />b. Two complete sets of revised construction drawings. <br />c. Two copies of supplemental structural calculations. <br />Submittal documents shall contain sufficient information and detail to review the proposed project <br />for compliance with the adopted codes. Upon submittal of the revised documents, your application <br />will be given priority and plan reviews will recommence. <br />Page 1 of 3 ` " <br />
The URL can be used to link to this page
Your browser does not support the video tag.