My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
905 80TH ST SW FORMOST FUJI 2024-10-07
>
Address Records
>
80TH ST SW
>
905
>
FORMOST FUJI
>
905 80TH ST SW FORMOST FUJI 2024-10-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2024 12:02:02 PM
Creation date
12/26/2023 11:24:08 AM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
905
Tenant Name
FORMOST FUJI
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRUCTURAL <br />E�NWENGINEERS <br />Engineers Northwest Inc., P.S. <br />February 13, 2023 <br />Lance Mueller and Associates <br />130 Lakeside Avenue South, Suite 250 <br />Seattle, WA 98122 <br />ATTN: Harold Christensen <br />RE: Formost Fuji Mezzanine, FFC Building <br />Everett, WA <br />Harold: <br />F <br />�� fQ 5 1023 <br />T Y J or <br />l PerrEVE�7 <br />hit 1 . <br />5er���C-s <br />This letter is an itemized response to City of Everett Plan Check comments by Drew Martin, <br />dated February 3, 2023, for the above referenced project (Plan Check No. B2301-011). Please <br />refer to updated structural drawings where noted. <br />Structural, Gravity System: <br />Item 1: See Supplemental Calculations for cantilevered beams and connections along <br />Grid 18.5. See Sheet 1/SC for condition at Grids A.3 and D.7. See Sheet 2/SC <br />for condition at Grids B and D. See Sheet 3/SC (RAM Steel output) for <br />cantilevered beam at Grid C. <br />Structural. Lateral Svstem: <br />Item 2: See updated Sheet S3.1. All braces are HSS 8 x 8 x 112. <br />Item 3: See Sheets 4/SC, 5/SC and 8/SC of the Supplemental Calculations for brace <br />connections. <br />Item 4: See revised Detail 4/S4.2. The vertical weld occurs on both sides of the <br />column. <br />Item 5: See revised Detail 5/S3.1 for added weld callout for gusset plate to beam. See <br />revised Detail 4/S4.2 for added weld callout for vertical embed plate to <br />horizontal base plate. <br />Item 6: The RAM Frame design includes the overstrength factor. See Sheets 10/SC — <br />25/SC of the Supplemental Calculations for summary of Seismic provisions <br />and parameters. <br />Item 7: See Sheets 6/SC, 7/SC and 9/SC of the Supplemental Calculations for column <br />base connections. <br />Please contact our office if you have further questions or require additional information. <br />Sincerely, <br />ENGINEERS NORTHWEST, INC., P.S. <br />Mark Nazarenus, P.E., S.E. <br />Engineer <br />MN:aj <br />ENW #15024003-3 <br />MAR 0 8 2023 <br />CITY OF EVERETT <br />Permit Services <br />• 0 • • • Y • • • R • • r <br />• 19020 33rd Ave W #530 • Lynnwood, WA 98036 <br />206.525 7560 • fax 206.522.6698 <br />www.engineersnw.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.