Laserfiche WebLink
10-CONTROL DEWATERING <br />For the proposed building, dewatering is not expected to be required. <br />Best Management Practices (BMPs) w be used: <br />• None Required <br />11-MAINTAIN BEST MANAGEMENT PRACTICES <br />BMPs will be inspected and maintained after storms and during construction. <br />Best Management Practices (BMPs) to be used; <br />• BMP C150: Materials on Hand <br />12-MANAGE THE PROJECT <br />This SWPPP will be implemented at all times and will be modified whenever there is a <br />significant change to the site conditions. The erosion control BMPs will be implemented <br />in the following sequence: <br />1. Arrange and attend pre -construction meeting with the city. <br />2. Flag clearing limits as indicated and install SWPP measures. <br />3. Construct buildings and driveways. <br />4. Stabilize disturbed land surfaces. <br />Beg Management Practices (BMPs) w be used: <br />• BMP C150: Materials on Hand <br />• BMP C162: Scheduling <br />13-PROTECT LOW IMPACT DEVELOPMENT BMPS <br />On -site stmanvater BMPs, existing and proposed, will be protected at all times from <br />siltation and compaction during construction. The approved plans have both construction <br />sequencing and appropriate SWPPP BMPs to minimize the risk to stomrwater BMPs. <br />Best Management Practices (BMPs) to be used: <br />• BMP C103: High Visibility Fence <br />• BMP C233: Silt Fence <br />