Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 3/2/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2103-004 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: N/A <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: SEPA20-027 <br /> WASHINGTON 425-257-8810 Public Works Fee: $1,492.64 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BOEING COMPANY BOEING COMPANY <br /> PO BOX 3707 MC OH-13 PO BOX 3707 MC OH-13 <br /> SEATTLE,WA,98124 SEATTLE,WA,98124 <br /> PHONE:4252602668 PHONE:4252602668 <br /> TAX PARCEL ID#:28041000100200 SITE ADDRESS:3003 W CASINO RD <br /> DESCRIPTION: BOEING STORMWATER PONDS UPGRADE <br /> Site stormwater improvements that requires work to be done in and around the stormwater ponds,as well as,an entire excavation and <br /> upgrade to the existing peat sand filter.This includes the installation of new storm drains, underground vaults, pumps,and a full <br /> replacement of water quality treatment media and the associated distribution system. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 4/21/2021.Approved plans must remain on <br /> job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved TESC Plan.Remove upon completion of the project prior <br /> to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities that are to remain during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW Inspector. <br /> 10. All excavated material shall be hauled to an approved,permitted site. <br /> 11. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site in a <br /> manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the improvements located <br /> therein. <br /> 12. It is the applicants/owner's responsibility to ensure that the combined outflow from the detention basin and EMF shall not exceed 49 cfs for up to <br /> a 25-yr,24-hr City of Everett design storm(2.6 in.precipitation total). <br /> 13.This permit must be finaled in order to close out this permit.Request a final inspection online by selecting PW 25-Site Final/Permit Close Out <br /> within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> Public Works Permit Fee Breakdown: Additional Permit Conditions based on revised SWPPP <br /> Erosion Control..................................................$200.00 14. Implement and operate the system in accordance with BMP C250. <br /> Grade/Fill/Excavate(116,5000Y)....................$1,185.00 15. Conduct sampling in accordance with BMP C250 and provide results to the City <br /> Paving(6,500SF)...................................................$45.00 inspector upon request. <br /> PW Plan Review...................................................$20.00 <br /> PW Site Inspection...............................................$20.00 ` City of Everett Permit Review <br /> Stormwater System Development Fee.................$22.64 EVERETT Status: Revisions Approved <br /> 10/20/2021 2:47:07 PM <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> Q hereby agrees to hold and save harmless the City of Everett from any <br /> 40f 10/20/2021 and all claims for damages,costs,expenses,or causes of action that <br /> S'� 4/21/2027 may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />