My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
>
Address Records
>
W CASINO RD
>
3003
>
BOEING STORMWATER MGT SYSTEM
>
3003 W CASINO RD BOEING STORMWATER MGT SYSTEM 2023-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:49:49 PM
Creation date
12/28/2023 9:38:56 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING STORMWATER MGT SYSTEM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PW2103-004 Description: BOEING STORMWATER PONDS UPGRADE <br /> Applied: 3/2/2021 Approved:4/22/2021 Site Address: 3003 W CASINO RD <br /> Issued:4/22/2021 Finaled: City,State Zip Code: EVERETT,WA <br /> Status:ARCHIVED-NOT FINALED Applicant: BOEING COMPANY <br /> Parent Permit: Owner: BOEING COMPANY <br /> Parent Project:SEPA20-027 Contractor: IMCO GENERAL CONSTRUCTION LLC <br /> Details: <br /> Site stormwater improvements that requires work to be done in and around the stormwater ponds,as well as,an entire excavation <br /> and upgrade to the existing peat sand filter.This includes the installation of new storm drains,underground vaults,pumps,and a full <br /> replacement of water quality treatment media and the associated distribution system. <br /> (4/20/20219:19 AM CAC) <br /> Powder Mill Gulch Basin: North and South Complex Area peak outflow from detention= 49 cfs. Based on 1998 Comprehensive Storm <br /> Drainage Plan inflow hydrographs(SWMM,Version 3)and detention basin expansion (HEC-1_routing analysis).The stormwater <br /> control facilities are designed to limit offsite discharge to less than 49 cfs for up to a 25-yr,24-hr City of Everett design storm (2.6 inch <br /> precipitation total).The max.release rate value was required by COE based on a previous 10-yr predevelopment rational method flow <br /> estimate. <br /> BOEING STORMWATER PONDS UPGRADE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> Notes: <br /> I_ <br /> Printed:Thursday, 28 December, 2023 1 of 1 F� <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.