My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2601 SUMMIT AVE BLDG F 2024-01-08
>
Address Records
>
SUMMIT AVE
>
2601
>
2601 SUMMIT AVE BLDG F 2024-01-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 3:28:29 PM
Creation date
12/29/2023 9:18:09 AM
Metadata
Fields
Template:
Address Document
Street Name
SUMMIT AVE
Street Number
2601
Unit
BLDG F
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
891
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Dawn Bushnaq <br />Bushnaq Studio Architecture + Design <br />Plan Check Number: B2109-083, First Building Review <br />February 2, 2022 <br />design loads should include vertical load effects per Section 12.4.2.2. Calculations <br />substantiating the design should be submitted for review. Additional hold-downs to complete <br />the vertical resistance load path to the foundation may be required. See IBC Sections 1604.1 <br />and 1604.4. <br />12. The "General Contractor's Prior Review" portion of the Deferred Submittals section in the <br />Structural General Notes on Sheet S101 includes design of the hold-downs. However, the <br />structural plans, details, and Shear Wall Schedule on Sheet S410 specify the required hold- <br />downs. See IBC Sections 107.2.1, 1604.1, 1613.1, and 1901.2. The following comments <br />should be addressed: <br />a. The hold-downs should be removed from the deferred submittals list. <br />b. Calculations substantiating the hold-down design should be submitted for review. The <br />anchorage loads at the concrete foundations should be determined per ACI 318-14 Section <br />17.2.3.4.3. If option (d) is used, the overstrength factor "Q" should be applied to the <br />earthquake component, not the net uplift. <br />c. Continuing with the previous comment, the load combinations should include the vertical <br />seismic affects per ASCE 7-16 Section 12.4.2.2. The load should be additive to increase the <br />required hold-down force. <br />d. The Hold -Down Schedule on Sheet S411 should be revised to clarify if the capacities are <br />allowable or factored values. <br />13. The diaphragm evaluation is provided on structural calculation pages WI-45 and WL-46. See <br />IBC Sections 1604.1, 1604.4, 1613.1, and 2306.1. The following comments should be <br />addressed: <br />a. The evaluation does not include the Level 2 diaphragm. While similar to the Level 3 <br />diaphragm, differences occur including but not limited to the opening at Grid D-F/10.5-11. <br />An evaluation should be performed. See also the following comments. <br />b. The building has Type 3 Horizonal and Type 4 Vertical structural irregularities per ASCE 7-16 <br />Tables 12.3-1 and 12.3-2, respectively. The diaphragm and collector forces should be <br />increased 25% per Section 12.3.3.4. <br />c. The framing plans appear to indicate multiple collectors, though the evaluation only <br />considers one location at each of the Level 3 and Roof diaphragms. Additional collectors <br />appear to be required due to shears with insufficient diaphragm connection lengths or non - <br />centric placement in the diaphragms, or both. Locations include but are not limited to Grid <br />5 at Levels 2 and 3, and Grids 5 and 9 at the Roof. Revised calculations substantiating the <br />collector design should be submitted for review, and additional collectors provided where <br />required. <br />d. Continuing with the previous comment, the Level 2 and 3 diaphragms do not appear to <br />have a complete load path in the area of Grid C-G/9-12. Much of this area lacks shear wall <br />support, either through direct connection or collectors. Chord and collector continuity <br />around openings and re-entrant corners does not appear to be provided. Additional chords <br />and collectors should be provided. See IBC Section 1604.4. <br />e. Diaphragm chords should be designed at all exterior re-entrant corners and interior opening <br />corners. The chords should be developed in each orthogonal direction and on both sides of <br />the corners. The chords and their connections should be design with amplified forces where <br />required by ASCE 7-16 Chapter 12. AWC SDPWS-15 Sections 4.1.4 and 4.2.6. <br />3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br />Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br />Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.