Ms. Dawn Bushnaq <br />Bushnaq Studio Architecture + Design <br />Plan Check Number: B2109-083, First Building Review <br />February 2, 2022 <br />Miscellaneous: <br />14. The following comments should be addressed for the elevator and lift systems: <br />a. The elevator and lift design drawings should be included in the list of deferred submittals in <br />the Structural General Notes. See IBC Section 107.3.4.1. <br />b. Estimated design loads for the elevator lift systems, including impact loading, should be <br />specified in the Structural General Notes. Estimated loads should account for increases due <br />to impact effects per IBC Section 1607.9.1. See IBC Sections 1603.1.8 and 1607.9.1. <br />c. Calculations substantiating the design of the structural framing resisting the elevator loads, <br />including multi -directional loading, concurrently with other loads should be submitted for <br />review. The calculations should include the evaluation of deflection limits per IBC Section <br />1607.9.1. See IBC Sections 1604.2 and 1605. <br />d. Continuing with the previous comment, the drawings appear to have a single HSS5 column <br />on one side of the shaft. See the following comments: <br />i. The column design is indicated as preliminary, which is acceptable. However, design <br />considering preliminary loads should be performed as indicated in these comments. <br />ii. The column is provided on only one side of the shaft. It is anticipated that a column <br />on each side is required. <br />iii. Connection details should be provided between the posts and the supporting <br />structure as indicated in these comments. <br />iv. Sheet S202b references Note 10. Note 12 appears to be the applicable reference. <br />e. The structural drawing should include details for the connection points for the elevator <br />guide rails. The required locations and maximum spacing for the connection points should <br />be specified in the structural drawings. Calculations for the connections should be <br />submitted for review. See IBC Section 107.2.1 and 1604.4. <br />15. The High Roof Framing Plan on Sheet S204 shows an elevator hoist beam. Details for framing <br />connections should be included providing bearing and a minimum positive connection capacity <br />per ASCE 7-10 Section 1.4.4. Calculations substantiating the design should be submitted for <br />review. See IBC Sections 1603.1 and 1604.1. <br />This review has been performed for general compliance with the building codes as adopted and <br />amended by the state of Washington and the city of Everett. Corrections and comments made <br />during the review process do not relieve the project from compliance with code and permit <br />requirements. The designers -of -record are responsible for a complete design in accordance with <br />the laws of the state of Washington. <br />If you have any questions or require additional clarification, please contact us. <br />Respectfully, <br />Drew Martin, P.E., S.E. <br />Associate Engineer / Commercial Plans Examiner <br />(425)257-8813 <br />dmartin@everettwa.gov <br />S:\BMartin\2021\B2109-083_Ri.docx <br />3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br />Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br />Page 10 of 10 <br />