My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2701 ROCKEFELLER AVE NIMBUS Geotech Report 2023-12-29
>
Address Records
>
ROCKEFELLER AVE
>
2701
>
NIMBUS
>
Geotech Report
>
2701 ROCKEFELLER AVE NIMBUS Geotech Report 2023-12-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 10:27:57 AM
Creation date
12/29/2023 10:26:41 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2701
Tenant Name
NIMBUS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OpportunRYZone Development LLC <br />June fi, 2019 <br />JN 19152 <br />Page B <br />If easements from neighboring property owners to install tieback anchors (or soil <br />nails) cannot be obtained, it may be necessary to utilize internal braces (rakers) to <br />restrain the soldier piles. Soldier piles restrained by rakers can undergo more <br />deflection than do tied -back or cantilever piles, due to the temporary sloped <br />excavation that is necessary in front of the soldier piles to install the rakers and <br />thrust blocks. This requires that the shoring designer closely evaluate the temporary <br />conditions that exist before raker installation. We should be contacted early in the <br />design process if rakers are necessary, in order to provide the appropriate design <br />considerations. <br />It is important that the shoring design provides sufficient working room to drill and <br />install the soldier piles, without needing to make unsafe, excessively steep <br />temporary cuts. Cut slopes should be planned to intersect the backside of the drilled <br />holes, not the back of the lagging. <br />Lateral movement of the soldier piles below the excavation level will be resisted by <br />an ultimate passive soil pressure equal to that pressure exerted by a fluid with a <br />density of 600 pcf. This soil pressure is valid only for a level excavation in front of the <br />soldier pile; it acts on two times the grouted pile diameter. Out slopes made in front <br />of shoring walls significantly decrease the passive resistance. This includes <br />temporary cuts necessary to install internal braces or rakers. The minimum <br />embedment below the floor of the excavation for cantilever soldier piles should be <br />equal to the height of the'stick-up." Tied -back soldier piles should be embedded no <br />less than 10 feet below the lowest point of the excavation, including footing and <br />utility excavations. <br />The vertical capacity of soldier piles to carry the downward component of the tieback <br />forces will be developed by frictional shaft resistance along the embedded pile <br />length. <br />Pile Shaft Friction 2,000 psf <br />Pile End -Bearing 20,000 Psi <br />When: par Is Pounds per Square FOOL <br />The above values assume that the excavation is level in front of the soldier pile and <br />that the bottom of the pile is embedded a minimum of 10 feet below the floor of the <br />excavation. For the pile end -bearing to be appropriate, the bottom of the drilled holes <br />must be cleaned of loosened soil. The shoring contractor should be made aware of <br />this, as it may affect their installation procedures. The concrete surrounding the <br />embedded portion of the pile must have suit clam bond and strength to transfer the <br />vertical load from the steal section through the concrete Into the soil. <br />TlebackAnchore <br />General considerations for the design of fled -beck anchors or braced soldier -pile <br />walls where two or more anchors or braces are used are presented on Plate 7. We <br />recommend Installing tieback anchors at Inclinations between 20 and 30 degrees <br />below horizontal. The tieback will derive its capacity from the soil -grout strength <br />OEOTEC1f CONSULTANTS, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.