Laserfiche WebLink
Opportunity Zone Development LLC JN 19152 <br />June 6, 2019 Page 1 <br />The following table presents recommended levels of relative compaction for compacted fill: <br />71evel <br />r 85% <br />d behind 91 <br />95%for upper 12 inches of <br />ents subgrade; 90%below that <br />evel <br />Where: Minimum aali Connection b the ratio, expressed In <br />psceniagee, er the composed dry density to Me maximum dry <br />density, as delerminad In accordance was ANTII Toot <br />Designation D 155741(Modified Procton. <br />Structural fill that will be placed In wet weather should conaiat of a coarse, granular sail with a slit or <br />clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve <br />should be measured from that portion of soil passing the threeequarter-inch sieve. <br />UMITATIONS <br />The Conclusions and recommendations contained in this report are based on site conditions as <br />they existed at the time of our exploration and assume that the soil and groundwater conditions <br />encountered in the test borings are representative of subsurface conditions on the site. If the <br />subsurface conditions encountered during construction are significantly different from those <br />observed in our explorations, We should be advised at once so that we can review these conditions <br />and reconsider our recommendations where necessary. Unanticipated Conditions are Commonly <br />encountered on Construction sites and cannot be fully anticipated by merely taking samples In test <br />findings. Subsurface conditions can also vary between exploration locations. Such unexpected <br />conditions frequently require making additional expenditures to attain a properly Constructed <br />project. It is recommended that the owner consider providing a contingency fund to accommodate <br />such potential extra costs and risks. This is a standard recommendation for all projects. <br />This report has been prepared for the exclusive use of Opportunity Zone Development LLC and Its <br />representatives, for specific application to this project and site. Our conclusions and <br />recommendations are professional opinions derived In accordance with our understanding of <br />current local standards of practice, and within the scope of our services. No warranty is expressed <br />or implied. The scope of our services does not Include services related to construction safety <br />precautions, and our recommendations are not Intended to direct the contractors methods, <br />techniques, sequences, or procedures, except as specifically described in our report for <br />consideration In design. Our services also do not include assessing or minimizing the potential for <br />biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site <br />development. <br />In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide <br />geote chnical conaultation, testing, and observation services during construction. This is to confirm <br />GEOTECH CON9ULTFHB, INC. <br />