My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2701 ROCKEFELLER AVE NIMBUS Geotech Report 2023-12-29
>
Address Records
>
ROCKEFELLER AVE
>
2701
>
NIMBUS
>
Geotech Report
>
2701 ROCKEFELLER AVE NIMBUS Geotech Report 2023-12-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 10:27:57 AM
Creation date
12/29/2023 10:26:41 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
2701
Tenant Name
NIMBUS
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Opportunity Zone Development LLC JN 19152 <br />June 6, 2019 Page 1 <br />The following table presents recommended levels of relative compaction for compacted fill: <br />71evel <br />r 85% <br />d behind 91 <br />95%for upper 12 inches of <br />ents subgrade; 90%below that <br />evel <br />Where: Minimum aali Connection b the ratio, expressed In <br />psceniagee, er the composed dry density to Me maximum dry <br />density, as delerminad In accordance was ANTII Toot <br />Designation D 155741(Modified Procton. <br />Structural fill that will be placed In wet weather should conaiat of a coarse, granular sail with a slit or <br />clay content of no more than 5 percent. The percentage of particles passing the No. 200 sieve <br />should be measured from that portion of soil passing the threeequarter-inch sieve. <br />UMITATIONS <br />The Conclusions and recommendations contained in this report are based on site conditions as <br />they existed at the time of our exploration and assume that the soil and groundwater conditions <br />encountered in the test borings are representative of subsurface conditions on the site. If the <br />subsurface conditions encountered during construction are significantly different from those <br />observed in our explorations, We should be advised at once so that we can review these conditions <br />and reconsider our recommendations where necessary. Unanticipated Conditions are Commonly <br />encountered on Construction sites and cannot be fully anticipated by merely taking samples In test <br />findings. Subsurface conditions can also vary between exploration locations. Such unexpected <br />conditions frequently require making additional expenditures to attain a properly Constructed <br />project. It is recommended that the owner consider providing a contingency fund to accommodate <br />such potential extra costs and risks. This is a standard recommendation for all projects. <br />This report has been prepared for the exclusive use of Opportunity Zone Development LLC and Its <br />representatives, for specific application to this project and site. Our conclusions and <br />recommendations are professional opinions derived In accordance with our understanding of <br />current local standards of practice, and within the scope of our services. No warranty is expressed <br />or implied. The scope of our services does not Include services related to construction safety <br />precautions, and our recommendations are not Intended to direct the contractors methods, <br />techniques, sequences, or procedures, except as specifically described in our report for <br />consideration In design. Our services also do not include assessing or minimizing the potential for <br />biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site <br />development. <br />In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide <br />geote chnical conaultation, testing, and observation services during construction. This is to confirm <br />GEOTECH CON9ULTFHB, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.