Laserfiche WebLink
OppodunWZone Development LLC JN 19152 <br />June 6, 2019 Page 18 <br />that subsurface conditions are consistent with those Indicated by our e1g11oration, to evaluate <br />whether earthwork and foundation construction activities comply with the general Intent of the <br />recommendations presented In this report, and to provide suggestions for design changes In the <br />event subsurface conditions differ from those anticipated prior to the start of construction. However, <br />our work would not include the supervision or direction of the actual work of the contractor and its <br />employees or agents. Also, Job and site safety, and dimensional measurements, will be the <br />responsibility of the contractor. <br />During the construction phase, we will provide geotechnlcal observation and testing services when <br />requested by you or your representatives. Please be aware that we can only document she work <br />we actually observe. It is still the responsibility of your contractor or on -site construction team to <br />verify that our recommendations are being followed, whether we are present at the site or not. <br />The following plates are attached to complete this report: <br />Plate 1 Vicinity Map <br />Plate 2 Site Exploration Plan <br />Plates 3 - 6 Test Boring Logs <br />Plate 7 Tied -back Shoring Detail <br />Plate 8 Multi -row Tied -back Shoring Detail <br />Plate 9 Typical Shoring Foundation Drain Detail <br />Plate 10 Typical Footing Drain Detail <br />We appreciate the opportunity to be of service on this project. Please contact us it you have any <br />questions, or it we can be of further assistance. <br />ASM/DRW:kg <br />Respectfully submitted, <br />GEOTECH CONSULTANTS, INC. <br />Adam S. Moyer <br />Geotechnical Engineer <br />06/06/19 <br />D. Robert Ward, RE. <br />Principal <br />GEOTECH CONSULTANrs, INC. <br />