Laserfiche WebLink
■ "Port of Everett Waterfront Place Central PGL Site 30% Design Drawings," prepared for Port of Everett, <br />by PND Engineers, Inc., dated September 1, 2021. <br />As shown in Figure 2, there is no existing geotechnical information (e.g., standard penetration tests [SPT], <br />cone penetration tests [CPT], or test pits) available within the PGL building footprint; therefore, a <br />geophysical survey was performed at the project site to correlate with the existing geotechnical information <br />near the building footprint to evaluate the subsurface conditions within the building footprint. <br />2.1. Bulkhead Conditions <br />The PGL site is located at the corner of 18th Street and the West Marine View Drive (State Route 529). The <br />north boundary of the project site is approximately 80 feet south to the bulkhead at the South Marina, next <br />to the Inn at Port Gardner; and the proposed retail building footprints are approximately 200 feet south of <br />the bulkhead. An existing retail store building is on the west side of the project site. <br />Based on our communication with the Port and PND, we understand that the bulkhead north of the project <br />site is basically a rock dike built in the mid-1970s, with marine sediment fill behind the dike, and a concrete <br />retaining wall, about 3 feet high, is sitting on top of the rock dike. Based on the review of available <br />engineering drawings, nearby geotechnical information (e.g., boring logs), and survey drawings within the <br />site vicinity, we assumed a constant existing ground surface across the project site at about Elevation <br />+18.00 feet. The slope in front of the dike was assumed to slope down at an approximate 1.5H:1V <br />(horizontal to vertical) slope from Elevation +16.00 feet to Elevation +1.00 feet, and an approximate <br />5.5H:1V slope from Elevation +1.0 feet to Elevation -12.00 feet. The elevation of -12.00 feet was the dredge <br />elevation in front of the bulkhead from the nearby project. Note that the project vertical datum is Mean <br />Lower Low Water (MLLW). <br />2.2. Subsurface Conditions <br />Based on our review of the nearby subsurface information, the soils at the project site generally consist of <br />hydraulic fill, recent deposits, and glacially consolidated soils. <br />Hydraulic fill generally consists of soft sandy silt (ML) and loose to medium dense silty sand (SM) containing <br />wood debris, organics, and shell fragments at some locations. <br />Recent deposits were encountered below the hydraulic fill and generally consist of soft to medium stiff <br />sandy silt and loose silty sand containing wood debris, organics, and shell fragments at some locations. <br />Some medium dense sands (SP) were observed at B-1 and P-3 under the above soft to medium stiff sandy <br />silty and loose silty sand layer, which is also part of the recent deposits. <br />Glacially consolidated soils were encountered below the recent deposits and generally consist of dense to <br />very dense sand, extended to the depths explored. Glacially consolidated soils are competent bearing soils. <br />The locations of the test pits, SPT, and CPT borings that were reviewed and used in our analyses are shown <br />in Figure 2. The corresponding test pits, SPT, and CPT logs are presented in Appendix A. <br />GWENGINEERS� April 1. 2022 Page 2 <br />Fib- No V i 6 030 00 <br />