Laserfiche WebLink
(E) GLIB, V.I.F. - <br />OF <br />EXTEND PLYWOOD TO FAR EDGE OF FIRST TRUSS VERT <br />FIELD VERIFY <br />- REMOVE (E) H1 CLIP <br />- A34 EA. SIDE TO 2x VERT <br />CUT TO FIT A 2x4 VERT AT BM <br />-=- -- ----------- <br />--------r°— — — <br />1 — — — — — — — — — — — — — — — — — — — <br />- SIMPSON HU38 <br />#8 x 2" WOOD SCREWS <br />@ 3" O/C AT TOP & <br />BOTT, TYP. EA. SIDE <br />/2 2 <br />S7388 <br />s L <br />THIS ELECTRONIC SEAL AND SIGNATURE IS <br />APPLIED WITHIN AN EL <br />ECTRONIC DOCUMENT. <br />A DIGITAL SIGNATURE IS APPLIED AT ONE <br />LOCATION IN THE DOCUMENT. <br />Page 23 of 24 <br />(E) ROOF SHTG <br />#8 x 2" WOOD SCREWS@ 2" O/C AT VERTS EA. <br />END, STAGGERED, TYP. EA. SIDE (16 TOTAL) <br />(E) 16" WOOD TRUSS, V.I.F. <br />--- 15/32" PLYWOOD EA. SIDE <br />NOTE: <br />PROVIDE (E) TRUSS REINFORCEMENTS PER SSK-03 AT <br />(3) TRUSSES UNDER NEW MECH UNITS, AT EA END OF <br />EA. TRUSS (12 LOCATIONS TOTAL), NOTIFY E.O.R. OF <br />ANY CONFLICTS OR DISCREPANCIES FOUND. <br />KI NGWORKS <br />STRUCTURAL <br />ENGINEERS <br />600 Dupont St, Suite B 360.714.8260 <br />Bellingham, WA 98225 www.king-works.com <br />TYP. EXISTING JOIST END REINFORCEMENT <br />PORT OF EVERETT <br />- MARINA VILLAGE RTU REPLACEMENT <br />Project number 22100 <br />SSK-03 <br />Date 05/31/2022 <br />Drawn by JT <br />Checked by BJ <br />Scale 1" =1'-0" <br />© copyright Kingworks Consulting Engineers PLLC: 2021 <br />b7621AWWA iFRIANLIA <br />