|
(1) 10 AWG THHN/THWN 2.CU.,BLACK(L1) 14 5 A AC (1) 10 AWG THHN/THWN•2,CU.,BLACK(L1) MAX 14.5 A A l) 10 AWG THHN/THWN-2,CU.,BLACK(Ill MAX 14.5 A 1) 12.2 TC-ER,THHN/THWN-2,CU. MAX 14 5 A AC
<br /> 1 c ](1)
<br /> (1) 10 AWG THHN/THWN-2,CU„RED(L2) 140 V AC a (1) 10 AWG THHN/THWN-2,CU,RED(L 2) 240 V A (l) 10 AWG THHN/THWN•2,CU.,RED(L2) 240 V A 1) 6 AWG BARE.CU(EGC) 240 V AC
<br /> 7 (l) 10 AVYGTHkN/THWN-2,CU.,WHITE(N) 7 (1) 10 AWG THHN/THWN-2,CU,GREEN(EGC) 11) 10 AWG THHN/THWN-2,CU.,GREEN(EGC)
<br /> 10 AWG THNN/THWN-2,CU.,GREEN(EGC) OR 10-2 OF-8 W/G,THHN/THWN-2,SOLID CU OR 10.2 OF-B WIG(OR NM-B),THHN/T"WN-2,SOLID CU
<br /> 1 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR (I) 3/4 INCH EMT(Not Required for OF-B or NM B Cable) INTERIOR EXTERIOR BLUE RAVEN
<br /> 1403 N. Research Way
<br /> Orem, UT 84097
<br /> 800.377.4480
<br /> W W W.BLUERAVENSOLAR.COM
<br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION
<br /> HEREIN CONTAINED SHALL NOT BE
<br /> LOAD SIDE BREAKER IN SP.THIN BREAKERS IN TOP LEFT OF SP. ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE
<br /> EXCEPT BLUE RAVEN SOLAR NOR
<br /> SHALL IT BE DISCLOSED IN WHOLE OR
<br /> IN PART TO OTHERS OUTSIDE
<br /> RECIPIENTS ORGANIZATION,EXCEPT
<br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND
<br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT,
<br /> (E)100A/2P MAIN BREAKER (E)125A SUBPANEL (SOLAR LOAD ONLY) WITHOUT THE WRITTEN PERMISSION
<br /> OF BLUE RAVEN SOLAR LLC.
<br /> PV AC DISCONNECT
<br /> (E)100A/2P NON-FUSED
<br /> L1 LOCKABLE,VISIBLE OPEN
<br /> L2 30A,240V,2-POLE (12)Wells Q.PEAK DUO BLK ML-G10+395 NABCEP
<br /> N (E)LOADS (E)LOADS ENVOY UL 1703 COMPLIANT
<br /> (12) Enphase IQ8PLUS-72-2-US CERTIFIED
<br /> N 1�2p
<br /> UL 1741 COMPLIANT
<br /> 4"x4"x4"PVC JB-1 EZ SOLAR
<br /> �PN JUNCTION BOX JUNCTION BOX PV INSTALLATION
<br /> (E)40A/2P (N)20A/2P
<br /> L, L, L, (N)20A/2P L, F JB �L,
<br /> JB--' ]Ll __ ___ (1) CIRCUIT OF PROFESSIONAL
<br /> L2 L2 L2 - -
<br /> L2 L2 L2 Scott Gurney
<br /> ___ EGC EGC EGC EGC EGC EGG 12 MODULES
<br /> -- -- G ------- ---------------------- F----- --- — -- G --- — --�-- F----- — — #PV-011719015866
<br /> I
<br /> 120/240 VAC N i 3 2 1 CONTRACTOR:
<br /> 60HZ I I *JUNCTION BOX BRS FIELD OPS
<br /> 1 PHASE I I OPTIONAL IF OF-B 800-377-4480
<br /> TO UTILITY I I
<br /> GRID I I CABLE USED FOR
<br /> G J I ENTIRE HOMERUN
<br /> I
<br /> I IF REQUIRED,VERIFICATION WILL BE DONE TO
<br /> I ENSURE THE GROUNDING ELECTRODE SYSTEM IS
<br /> I CONGRUENT WITH CURRENT REQUIREMENTS.(NEC U U
<br /> 250 PART III)IF NOT,A NEW GES WILL BE INSTALLED. Q Q
<br /> I Z Co
<br /> CNI
<br /> (E)GROUNDING (2)NEW%"COPPER GROUND O 00
<br /> ELECTRODE(S) — ROD,8'LONG,SPACED MIN.6' M 00
<br /> APART. Q C: "
<br /> GEC INSTALLED PER NEC ca/ 0 C7
<br /> 250.64:6 OR 4 AWG SOLID ��� I Q W W
<br /> COPPER GEC
<br /> IL � Z NN
<br /> Z U) Cl) Cl)
<br /> 0
<br /> wW $� 2023 .03 .0 - �,. � � � U) U)
<br /> wnsyF� = i. T ° � � LU > �
<br /> �o � - ..tit � � �, w cncn
<br /> 2 3*56 ,. ,, c� cnc�( w ao
<br /> � f' "
<br /> A Cw 4, a �T DRAWING BY:
<br /> FCISTER�� _ 7 •
<br /> PremiumCAD
<br /> "( NAL 0 / 0 0 @ Lt-- '� t
<br /> L{�W Z40. 3• t�10t�YOli u� PLOT DATE:
<br /> -�27'7 98?
<br /> March 2, 2023
<br /> INTERCONNECTION NOTES b3 ?77 q82 PROJECT NUMBER:
<br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO
<br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, 714712
<br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER
<br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT ♦� SHEET NAME:
<br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE t ELECTRICAL
<br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF _THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT * I i 1 - REVISION: PAGE NUMBER:
<br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Puget Sound Energy PERMIT ISSUER: City of Everett 0 PV5
<br />
|