Laserfiche WebLink
(1) 10 AWG THHN/THWN 2.CU.,BLACK(L1) 14 5 A AC (1) 10 AWG THHN/THWN•2,CU.,BLACK(L1) MAX 14.5 A A l) 10 AWG THHN/THWN-2,CU.,BLACK(Ill MAX 14.5 A 1) 12.2 TC-ER,THHN/THWN-2,CU. MAX 14 5 A AC <br /> 1 c ](1) <br /> (1) 10 AWG THHN/THWN-2,CU„RED(L2) 140 V AC a (1) 10 AWG THHN/THWN-2,CU,RED(L 2) 240 V A (l) 10 AWG THHN/THWN•2,CU.,RED(L2) 240 V A 1) 6 AWG BARE.CU(EGC) 240 V AC <br /> 7 (l) 10 AVYGTHkN/THWN-2,CU.,WHITE(N) 7 (1) 10 AWG THHN/THWN-2,CU,GREEN(EGC) 11) 10 AWG THHN/THWN-2,CU.,GREEN(EGC) <br /> 10 AWG THNN/THWN-2,CU.,GREEN(EGC) OR 10-2 OF-8 W/G,THHN/THWN-2,SOLID CU OR 10.2 OF-B WIG(OR NM-B),THHN/T"WN-2,SOLID CU <br /> 1 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR (I) 3/4 INCH EMT(Not Required for OF-B or NM B Cable) INTERIOR EXTERIOR BLUE RAVEN <br /> 1403 N. Research Way <br /> Orem, UT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> LOAD SIDE BREAKER IN SP.THIN BREAKERS IN TOP LEFT OF SP. ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)100A/2P MAIN BREAKER (E)125A SUBPANEL (SOLAR LOAD ONLY) WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT <br /> (E)100A/2P NON-FUSED <br /> L1 LOCKABLE,VISIBLE OPEN <br /> L2 30A,240V,2-POLE (12)Wells Q.PEAK DUO BLK ML-G10+395 NABCEP <br /> N (E)LOADS (E)LOADS ENVOY UL 1703 COMPLIANT <br /> (12) Enphase IQ8PLUS-72-2-US CERTIFIED <br /> N 1�2p <br /> UL 1741 COMPLIANT <br /> 4"x4"x4"PVC JB-1 EZ SOLAR <br /> �PN JUNCTION BOX JUNCTION BOX PV INSTALLATION <br /> (E)40A/2P (N)20A/2P <br /> L, L, L, (N)20A/2P L, F JB �L, <br /> JB--' ]Ll __ ___ (1) CIRCUIT OF PROFESSIONAL <br /> L2 L2 L2 - - <br /> L2 L2 L2 Scott Gurney <br /> ___ EGC EGC EGC EGC EGC EGG 12 MODULES <br /> -- -- G ------- ---------------------- F----- --- — -- G --- — --�-- F----- — — #PV-011719015866 <br /> I <br /> 120/240 VAC N i 3 2 1 CONTRACTOR: <br /> 60HZ I I *JUNCTION BOX BRS FIELD OPS <br /> 1 PHASE I I OPTIONAL IF OF-B 800-377-4480 <br /> TO UTILITY I I <br /> GRID I I CABLE USED FOR <br /> G J I ENTIRE HOMERUN <br /> I <br /> I IF REQUIRED,VERIFICATION WILL BE DONE TO <br /> I ENSURE THE GROUNDING ELECTRODE SYSTEM IS <br /> I CONGRUENT WITH CURRENT REQUIREMENTS.(NEC U U <br /> 250 PART III)IF NOT,A NEW GES WILL BE INSTALLED. Q Q <br /> I Z Co <br /> CNI <br /> (E)GROUNDING (2)NEW%"COPPER GROUND O 00 <br /> ELECTRODE(S) — ROD,8'LONG,SPACED MIN.6' M 00 <br /> APART. Q C: " <br /> GEC INSTALLED PER NEC ca/ 0 C7 <br /> 250.64:6 OR 4 AWG SOLID ��� I Q W W <br /> COPPER GEC <br /> IL � Z NN <br /> Z U) Cl) Cl) <br /> 0 <br /> wW $� 2023 .03 .0 - �,. � � � U) U) <br /> wnsyF� = i. T ° � � LU > � <br /> �o � - ..tit � � �, w cncn <br /> 2 3*56 ,. ,, c� cnc�( w ao <br /> � f' " <br /> A Cw 4, a �T DRAWING BY: <br /> FCISTER�� _ 7 • <br /> PremiumCAD <br /> "( NAL 0 / 0 0 @ Lt-- '� t <br /> L{�W Z40. 3• t�10t�YOli u� PLOT DATE: <br /> -�27'7 98? <br /> March 2, 2023 <br /> INTERCONNECTION NOTES b3 ?77 q82 PROJECT NUMBER: <br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, 714712 <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT ♦� SHEET NAME: <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE t ELECTRICAL <br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF _THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT * I i 1 - REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Puget Sound Energy PERMIT ISSUER: City of Everett 0 PV5 <br />