My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Carollo Engineers 1/8/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Carollo Engineers 1/8/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 10:45:39 AM
Creation date
1/9/2024 10:45:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Carollo Engineers
Approval Date
1/8/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF Combined Conveyance Improvement
Public Works WO Number
UP3799
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003500
Total Compensation
$1,153,135.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />COMBINED SEWER CONVEYANCE PROJECT – SCOPE OF WORK CATEGORY 2 – FOR OFFICIAL USE ONLY / DISCLOSURE PERMISSIBLE BY LAW 10 <br />ii. Erosion and Sediment Control: <br />(1) General notes and legend. <br />(2) Typical details. <br />iii. Civil: <br />(1) Overall plan and profile showing locations of the diversion structures and pipes. <br />iv. Mechanical/Structural: <br />(1) General structural notes and code requirements. <br />(2) Plans and sections of Line C diversion structure. <br />(3) Plans and sections of diversion structure downstream of DS 1. <br />(4) Plan and section of the discharge structure. <br />v. Electrical: <br />(1) Electrical legend. <br />(2) Electrical abbreviations. <br />(3) One line diagram. <br />vi. Instrumentation: <br />(1) Symbol and abbreviations sheets. <br />(2) Schematic symbols sheet. <br />(3) Process and Instrumentation Diagram (for gates). <br />e. Opinion of probable construction cost estimate (AACIE Class 3). <br />f. Updated Risk Management Log. <br />g. Updated Decision Log. <br />2. Conduct a videoconference with the City to present the 30 percent submittal. <br />3. Review and respond to City review comments via Record of Comments Log. <br />4. Perform design services to prepare a 60 percent level of completion of the documents for review by <br />the City and for permit application packages for the US Army Corps of Engineers permit under <br />Nationwide Permit 12, water quality certification by the Washington State Department of Ecology <br />under Section 401 of the Clean Water Act, and Ecology review for consistency under the state CZM. <br />The submittal will include: <br />a. Draft Division 00 sections. <br />b. Draft Division 01 sections. <br />c. Draft technical specification sections. <br />d. Drawings prepared to a 60 percent level of completion: <br />i. General: <br />(1) Cover sheet. <br />(2) Preliminary drawing sheet list. <br />(3) General notes and design criteria. <br />(4) Hydraulic profile from the plant headworks through DS 1 and the CS bypass system and <br />design criteria table. <br />(5) Liquid stream process flow diagram showing CS bypass system revisions.
The URL can be used to link to this page
Your browser does not support the video tag.