Laserfiche WebLink
<br />COMBINED SEWER CONVEYANCE PROJECT – SCOPE OF WORK CATEGORY 2 – FOR OFFICIAL USE ONLY / DISCLOSURE PERMISSIBLE BY LAW 11 <br />(6) General notes, legends, and abbreviation sheets for erosion control, civil, structural, <br />electrical, and instrumentation and control. <br />ii. Erosion and Sediment Control: <br />(1) General notes and legend. <br />(2) Erosion and Sediment Control plan sheets. <br />(3) Typical erosion and sediment control details. <br />iii. Civil: <br />(1) Overall plan showing locations of the diversion structures and pipes. <br />(2) Pipeline plan and profile. <br />(3) Wetland restoration plan. <br />(4) Wetland restoration planting details and notes. <br />iv. Mechanical/Structural: <br />(1) General structural notes and code requirements. <br />(2) Pipe support sections and details. <br />(3) Plans and sections of Line C diversion structure. <br />(4) Plans and sections of diversion structure downstream of DS 1. <br />(5) Plans and sections of the discharge structure. <br />(6) Typical Structural Details. <br />v. Electrical: <br />(1) Electrical legend. <br />(2) Electrical abbreviations. <br />(3) One line diagram. <br />vi. Instrumentation: <br />(1) Symbol and abbreviations sheets. <br />(2) Schematic symbols sheet. <br />(3) Process and Instrumentation Diagram (for gates). <br />e. Updated opinion of probable construction cost (AACIE Class 2). <br />f. Updated Risk Management Log. <br />g. Updated Decision Log. <br />5. Conduct a videoconference with the City to present the 60 percent submittal. <br />6. Review and respond to City review comments via Record of Comments Log. <br />7. Incorporate city review comments into the 60 percent documents and prepare figures and <br />narratives for permit application packages for the US Army Corps of Engineers permit under <br />Nationwide Permit 12, water quality certification by the Washington State Department of Ecology <br />under Section 401 of the Clean Water Act, and Ecology review for consistency under the state CZM. <br />8. Perform design services to prepare a 90 percent level of completion of the documents for review by <br />the City. <br />a. 90 percent complete submittal will include the Division 00, Division 01, technical specifications, <br />and drawings complete and ready to be issued for construction following incorporation of city <br />review comments and incorporation of criteria required by permitting agencies.