Laserfiche WebLink
Washington State Department of Transportation <br />Supplemental Agreement Organization and Address <br />Number 2 TranTech Engineering, LLC <br />Original Agreement Number 365 - I 18th Ave SE, Suite 100 <br />Bellevue, WA 98005 EBR-3694 Phone: <br />Project Number Execution Date Completion Date <br />BRM-2776(009) 1/31/2020 12/31/2026 <br />Project Title New Maximum Amount Payable Edgewater Bridge Replacement $3 ,647,608 <br />Description of Work <br />The Bridge constructed in 1946, is a vital link in a chain of three bridges that provide the only access to neighborhoods located along the Mukil teo Boulevard. The existing structure is a 5-span 352 feet (52':78.5':91 ':78.5: 52') and 37 feet wide and is deficient in both shear and deck capacities. <br />The new replacement bridge will be approximately 375 feet long and 49 feet wide. The bridge facility will <br />have (2) 12-foot lanes, (2) 5-foot shoulders and (2) 6.5-foot sidewalks. <br />The Local Agency of -'-'-'l,l!....1.1!..l'--"-""--"-'-L------------------------­ <br />desires to supplement the agreement entered in to with Trantech Engine eri ng, LLC <br />and executed on 1/31/2020 and identified as Agreement No . .,.E,,B,,R""-"'3"'6""9::,:4 _________ _ <br />All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br />The changes to the agreement are described as follows: <br />I <br />Section 1, SCOPE OF WORK, is hereby changed to read: <br />Additional design services as requested by the City and described in Exhibit A -Scope of Work <br />II <br />Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days <br />for completion of the work to read: �1�2�/3�1�/2"'0"'2.,_7 ____________________ _ <br />Ill <br />Section V, PAYMENT, shall be amended as follows: <br />The current contract amount of$3,509,212 is supplemented for an additional $138,396 for a new maximum payable amount of3,647,608. <br />as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br />If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. <br />By: TranT ech Engineerin g LLC <br />DOT Form 140-063 <br />Revised 09/2005 <br />By: ______________ _ <br />Date <br />City of Everett <br />Cassie Franklin, MayorKhashayar Nikzad, President <br />01/08/2024 <br />Attest: