My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech 1/8/2024 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech 1/8/2024 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 11:04:19 AM
Creation date
1/9/2024 11:04:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech
Approval Date
1/8/2024
Council Approval Date
1/31/2020
End Date
12/31/2026
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0002205
Total Compensation
$138,396.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Supplement No. 2 -Scope of Work <br />Edgewater Bridge Replacement <br />INTRODUCTION <br />Under the Edgewater Bridge Replacement project, the City of Everett (City) has <br />requested that TranTech Engineering, LLC's team (Consultant) prepare a supplement <br />to provide professional services to perform work not included within the original <br />Scope of Services and Construction Phase Engineering and Construction <br />Management Services. <br />Additional design phase services provided by TranTech and one of the Tran Tech <br />team's members, Pe1teet, under Work Elements 1, 11, 12, and 13. Work elements <br />consisted of additional project management, additional structural, civil, utility and <br />stormwater design changes. These additional services are necessary as the result of <br />structural wall and bridge modifications, negotiations with the adjacent property <br />owners and the result of revisions needed to make the project improvements <br />compatible with other City projects, including Edgewater Park. Additionally, the <br />plans are needed to be revised to prepare City's intended re-bid package and <br />incorporate WDFW and HP A conditions for the rebid package. These design <br />revisions require additional coordination, preparation of pre-ad ready plans, estimate, <br />and specifications for an additional submittal, additional plan, estimate, and <br />specifications. <br />In the following the aforementioned additional scope of work is described in fmther <br />detail. <br />ADDITIONAL DESIGN PHASE SCOPE OF SERVICES <br />The additional Scope of Services described below are the work elements to be <br />accomplished by the Consultant as summarized under each Task. This scope consists <br />of the following elements: <br />(The task numbers below correspond to the original Scope of Services.) <br />Work Element 1 -Project Management (Supplemented) <br />Work Element 11 -Civil, Roadway & Drainage Design (Supplemented) <br />Work Element 12-Structural Design (Supplemented) <br />City of Everett -Edgewater Bridge Replacement <br />Page 11 <br />Exhibit "A"
The URL can be used to link to this page
Your browser does not support the video tag.