My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 1/18/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KPFF Consulting Engineers 1/18/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:29 AM
Creation date
1/19/2024 10:25:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
1/18/2024
Council Approval Date
1/10/2024
End Date
12/31/2027
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Later Phase Eclipse Mill Park Project & Riverfront Trail Improvement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003149
Total Compensation
$513,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
KPFF Consulting Engineers 12/30/2021
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Consulting Engineers <br />1601 5th Avenue, Suite 1600, SEATTLE, WA 98101 P:206-622-5822 F:206-622-8130 WWW.KPFF.COM <br />P a g e 4 | 7 <br />updated based on recent City contracts provided to the CONSULTANT by the CITY, as well as <br />unit cost information obtained from other industry sources, such as WSDOT unit price analysis, <br />and others, as necessary. <br />800.4 Project Coordination Meetings and PM <br />The CONSULTANT shall participate in up to six (6) project coordination meetings. All meetings <br />are assumed to be virtual and lasting 1-hour. <br />800.5 Prepare Easement Exhibit and Descriptions <br />The CONSULTANT shall prepare easements and legal descriptions for a temporary construction <br />easement and a permanent easement on Parcel 00576001500003 (Riverfront Commercial, LLC). <br />Deliverables <br />Deliverables to be provided subsequent to this task include: <br />•One (1) set of half-size 100% Plans in PDF format. <br />•100% engineer's construction cost estimate (Excel). <br />•100% Specifications in CSI format (Word). <br />•Final SWPPP. <br />•Response to 90% review comments (Excel) delivered with the 100% plan set. <br />•Prepare easements and legal descriptions for a temporary construction easement and a <br />permanent easement on Parcel 00576001500003 (Riverfront Commercial, LLC). <br />Task 900 – Bid-Ready Plans, Specifications, and Estimates: <br />The CONSULTANT shall finalize the design documents in anticipation of bid. Bid ready Plans, <br />Specifications and Estimates will be prepared separately as outlined for each project: 1) Later Phase <br />Eclipse Mill Park; 2) Riverfront Trail Improvements. <br />900.1 Prepare Bid-ready Design Plans <br />The CONSULTANT shall develop final plans for construction as defined in task subtask 600. <br />900.2 Prepare Bid-ready Specifications <br />The CONSULTANT shall prepare the project specifications for bid. <br />900.3 Prepare Final Engineer’s Construction Cost Estimate <br />The CONSULTANT shall finalize the engineer's construction cost estimate. <br />900.4 Project Coordination Meetings and PM <br />The CONSULTANT shall participate in up to two (2) project coordination meetings. All meetings <br />are assumed to be virtual and lasting 1-hour. <br />Deliverables <br />Deliverables to be provided subsequent to this task include: <br />•Bid-ready Plans in PDF format. <br />•Final engineer's construction cost estimate (Excel). <br />•Bid-ready Specifications in CSI format (Word).
The URL can be used to link to this page
Your browser does not support the video tag.