My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF Consulting Engineers 1/18/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
KPFF Consulting Engineers 1/18/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 10:26:29 AM
Creation date
1/19/2024 10:25:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KPFF Consulting Engineers
Approval Date
1/18/2024
Council Approval Date
1/10/2024
End Date
12/31/2027
Department
Parks
Department Project Manager
Brad Chenoweth
Subject / Project Title
Later Phase Eclipse Mill Park Project & Riverfront Trail Improvement Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003149
Total Compensation
$513,752.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
KPFF Consulting Engineers 12/30/2021
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Consulting Engineers <br />1601 5th Avenue, Suite 1600, SEATTLE, WA 98101 P:206-622-5822 F:206-622-8130 WWW.KPFF.COM <br />P a g e 3 | 7 <br />•Anchor QEA will reach out to review agencies once per month during the permit review <br />process. If more frequent outreach is needed, a scope amendment may be required. <br />•One set of minor comments will be responded to by Anchor QEA. This task does not <br />include preparing any new analyses or documentation if requested by the agencies. If <br />more substantive comments are received by review agencies, a scope amendment will <br />be required. <br />•This task does not include mitigation coordination or documentation. <br />•This task is based under CONSULTANT’S current understanding that there is no <br />actual or documented soil or groundwater contamination at the project site. If the site is <br />found/considered by Ecology to be contaminated, the additional work to coordinate <br />with Ecology, collect samples, and/or prepare application or additional supporting <br />documents will require additional scope and budget to complete. <br />•The existing cultural resources documentation submitted with the permit application will <br />be sufficient for National Historic Protection Act Section 106 compliance. <br />•A Clean Water Act Section 404(b)(1) Alternatives Analysis will not be required. <br />•This scope does not include budget for Dredged Material Management Program <br />(DMMP) coordination. If DMMP coordination is required, additional scope and budget <br />will be required. <br />Deliverables <br />Deliverables to be provided subsequent to this task include: <br />•CSGP Notice of Intent Application (copy of online submittal). <br />•Stormwater Pollution Prevention Plan (SWPPP). <br />•Email responses to agency comments or questions. <br />Task 800 – 100% Plans Specifications and Estimates: <br />The CONSULTANT shall develop the 100% level design plans from previous work completed in the <br />90% design phase and the project environmental and permitting processes. The CONSULTANT shall <br />review and provide written responses to CITY comments on the 90% level design plan submittal and <br />the project environmental and permitting processes. <br />800.1 Prepare 100% Level Design Plans <br />The CONSULTANT shall develop 100% level design plans; each site to be compiled as a stand- <br />alone package for bid, including contract specifications and bid proposal, cost estimate, etc. Plans <br />shall be prepared to current City standards and other reference documents. CONSULTANT shall <br />address comments on the Draft SWPPP and submit the final with the 100% submittal. <br />The No-Rise Evaluation Memorandum prepared previously will undergo Agency review. <br />Consultant shall address all review comments and update memorandum as needed and submit a <br />final memorandum. <br />800.2 Prepare 100% Level Design Plan Specifications <br />The CONSULTANT shall prepare the project specifications (standard specification and special <br />provisions) for the 100% level design plans. <br />800.3 Prepare 100% Level Design Plan Engineer’s Construction Cost Estimate <br />The CONSULTANT shall update the 90% engineer's construction cost estimate using estimated <br />quantities from the 100% level design plans and review the unit costs. These costs may be
The URL can be used to link to this page
Your browser does not support the video tag.