Laserfiche WebLink
5. Survey for Binding Site Plan: <br /> A survey is required for all Binding Site Plans and must be conducted by or <br /> under the supervision of a registered licensed land surveyor in the state of <br /> Washington in accordance with Section 7.I of this Ordinance. <br /> F. Final Review and Approval Process <br /> 1. Required Review Process: <br /> a) A final binding site plan shall be reviewed as a Review Process I as <br /> defined in Ordinance No. 2136-96, as amended. <br /> b) Prior to the submittal of any preliminary binding site plan to the City for <br /> final approval, the applicant must demonstrate compliance with all of the <br /> conditions of the preliminary approval or previously approved site plan <br /> and prepare all of the necessary final documents as required in Section <br /> S.E. <br /> c) Applicants for final binding site plan approval shall file their final <br /> binding site plan map meeting all the requirements of Chapter 58.17 <br /> RCW and this Ordinance with the City's Public Works Department. <br /> The Public Works Department shall review the final binding site plan <br /> and circulate it to other City departments to determine whether the <br /> requirements of this Ordinance have been met. <br /> d) The Director and City Engineer shall determine whether requirements of <br /> this Ordinance have been met. If the requirements have been met, they <br /> shall certify that the proposed final binding site plan meets the <br /> requirements of Chapter 58.17 RCW and this Ordinance. <br /> e) If either the Director or the City Engineer determines that the <br /> requirements of this Ordinance have not been met, the final binding site <br /> plan shall be returned to the applicant for modification, correction, or <br /> other action as may be required for approval. <br /> fl Pursuant to the requirements of RCW 58.17.150, neither the Director <br /> nor the City Engineer shall modify the requirements made in the City <br /> approval of the preliminary binding site plan or previously approved site <br /> plan when making a decision on the final binding site plan without the <br /> consent of the applicant, except as provided in Chapter 58.17 RCW. <br /> 2. City Approval of Final Binding Site Plan: <br /> a) The City, consistent with Review Process I as defined in Ordinance No. <br /> 2136-96, as amended, shall determine whether the binding site plan <br /> proposed for final approval conforms to all terms of preliminary <br /> approval, and whether the binding site plan meets the requirements of <br /> this Ordinance, applicable State laws and all other local ordinances <br /> adopted by the City which were in effect at the time of preliminary <br /> approval. <br /> 41 <br />