Laserfiche WebLink
Proje f�� Bridge Point Everett 500-Building B-2018 WSEC ® t ate 4 �/ " 022 <br /> SHGC x A Calculation NEW BUILDING-SEMI-HEATED COMPLIES <br /> i Fenestration and Opaque Door Assemblies PROPOSED TARGET <br /> Glazed Doors-North Facing Assembly ID PF Glazed Door Rough Opening SHGC x A Glazed Door g Rough Opening SHGC x A ! <br /> SHGC (SF) SHGC I.__ (SF)141.6 <br /> _.. <br /> Swinging entrance door Storefront Doors PF<0.2 0.038 ' 144.0 5.5 0.51 72'2 <br /> (0.9834) <br /> Horizontal Assembly ID PF ( Skylight Rough Opening SHGC x A Skylight Rough Opening SHGC x A <br /> SHGC (SF) SHGC (SF) , <br /> 1,120.0 <br /> Skylights Acrylic Triple Dome Skylight 0.350 1,120.0 392.0 0.35 (1) 392 0 <br /> - € <br /> Fenestration Rough OpeningRough Opening E <br /> Vertical Fenestration-North Facing Assembly ID PF SHGC (SF) , SHGC x A SHGC (S SHGC x A ; <br /> Fixed-Class AW or site built See A2.1,A2.2&A3.1-North Facing PF<0.2 0.380 2,086.0 [ 792.7 0.51 2,051.4 1,046.2 r <br /> l (0.9834) <br /> Vertical Fenestration-South/East/West Facing Assembly ID PF Fenestration RoughO�ening ; SHGC x A Fe <br /> SHGC SHGC on Rougnestrati OF)pening SHGC x A ` <br /> Fixed-Class AW or site built See A2.1,A2.2&A3.1 PF<0.2 0.380 1,254.0 1,2332 <br /> 4765 € 0.38 ( ) � <br /> , 0.9834 f �� �fa�yF <br /> - , . <br /> i 1 Proposed Area Proposed SHGC x A I Target Area Target SFIGC x A <br /> Project Totals 4,604 1,667 4,567 2,006 G <br /> TARGET AREA ADJUSTING <br /> • <br />